Supply and replacement of Passenger lift Sheave and bearing
ServicesJOB REFERENCE:
JB007-25-04738
1. Introduction
Horizon Tower is a
premium residential building located in the heart of Dubai Marina, opposite
DMCC Metro Station. The tower features residential units, amenities, and
landscaped areas designed to offer a modern and comfortable living environment.
2. Scope of Work
A. Supply and replacement of Passenger lift
Sheave and bearing
· Inspect the site
· Remove the old sheave with necessary
equipment’s for Lift no 1 & 3
· Supply new sheave # 2 no’s
· Installation of new sheave with
Necessary material for for Lift no 1 & 3
3. Lift Specification
(Lift No #1 and Lift no #3 )
· Make :- Fujitec
· Capacity :- 900Kg (12 persons )
· Lift room location :- 46th
floor
|
Condition |
Details |
|
Project Timeline |
Completion
within 30 working days after issuance of LPO. |
|
Permissions &
NOCs |
All required
permissions to be obtained by the vendor. |
|
Warranty |
2-year comprehensive
warranty for all materials and workmanship. |
|
Coordination |
Contractor to
coordinate with building management to minimize disturbance to residents. |
|
Safety Compliance |
Must comply with UAE
safety and municipality regulations. |
|
Insurance |
Vendor to provide
valid insurance for manpower, material, and liability. |
. Service Level
Agreement (SLA)
|
Activity |
Performance
Standard |
Response
Time |
Completion
Time |
|
Site Mobilization |
Complete manpower and
material mobilization |
Within 3 working days
of award |
N/A |
|
Execution of Works |
Adherence to scope,
safety & quality standards |
Continuous monitoring |
Within agreed project
duration |
|
Rectification of
Defects (Warranty) |
Attend reported
defects |
Within 48 hours |
Within 3 working days |
|
Site Clean-up &
Handover |
Full cleanup and
debris removal |
Immediate after
completion |
N/A |
7. Key
Performance Indicators (KPI)
|
KPI |
Target |
Measurement
Method |
|
Quality of
Workmanship |
100% compliance with
specifications |
Post-inspection and
approval |
|
Adherence to Timeline |
≥95% on-time
completion |
Progress tracking
report |
|
Safety Compliance |
Zero violations /
accidents |
Site safety audits |
|
Communication &
Reporting |
Weekly updates to
management |
Progress meeting
reports |
|
Warranty Support |
100% rectification
within SLA |
Follow-up &
closure reports |
|
6. Site Contact
Details Building Name: Horizon Tower 050 2725615 |
Terms & Condition
SAGA International Owners Association Management Services LLC
Horizon Tower Jointly Owned Property
ResidentialHorizon Tower Dubai Marina, Dubai, United Arab Emirates