SHARED- Replacement of Split Unit in Main Gate Security Cabin (Both Indoor and Outdoor Unit)

Break Down
Posted On: March 26, 2025
Closing On: April 9, 2025
JOB REFERENCE:
JB007-25-00958

The capacity of split unit is 18300 btu/h. Attached specification pictures for your review.

 

Scope of work for replacement of this unit is:

 

  1. Unit Disconnection and removal of existing unit.
  2. Installation of new indoor and outdoor unit.
  3. Installation of refrigerant line.
  4. Electrical and drainage connection.
  5. System testing and commissioning.
  6. Site cleanup and handover
Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
APPLY NOW
SAGA International
SAGA International
Balqis Residence Jointly Owned Property
Balqis Residence Jointly Owned Property
Mixed Use

Balqis Residence Palm Jumeirah West Crescent, Dubai, United Arab Emirates

Share