Proposal for Replacement of Faulty RAHU Blower Assemblies
Break Down
Posted On:
February 25, 2026
Closing On:
February 27, 2026
JOB REFERENCE:
JB004-26-00929
Summary
The Recirculation Air Handling Unit (RAHU) blowers (55 Nos.) at J&G Building have reached the end of their service life. Installed in 2004 and repeatedly repaired over the years, the blowers are now severely rusted and worn out beyond repair, resulting in inadequate cooling in the served residential rooms. Urgent replacement is required to restore reliable operation.
Scope of Work
Dismantle and remove fifty-five (55 Nos.) faulty RAHU blower assemblies.
Supply fifty-five (55 Nos.) new blower assemblies compatible with existing RAHUs.
Install and reconnect electrical connections for RAHU blowers.
Test and commission RAHUs to ensure proper airflow and reliable cooling performance.
APPLY NOW
HOAM- Highrise Owners Association Management
Jewellery & Gemplex
Mixed UseJLT, Dubai, United Arab Emirates