NED 02 - EV Charger Installation

Enhancement
Posted On: November 23, 2026
Closing On: December 3, 2026
JOB REFERENCE:
JB6711-26-00764
  • Supply and installation of high-speed dual-plug EV chargers, allowing two vehicles to charge simultaneously at one charging station.
  • Proposed charging capacity: Approximately 80 kW per station, subject to available spare electrical load.
  • Inspect the existing electrical infrastructure and confirm the available load and feasibility.
  • Include all necessary cables, accessories, protection devices, civil works (if required), testing and commissioning.
  • Provide technical specifications, warranty details and maintenance requirements.

Required quotation should include the following:

  • Quotation
  • Unit Rate and Total Price
  • Proposed Make/Model
  • Warranty
  • Quotation Validity
  • Payment Terms
  • Exclusions

 

Terms & Condition

30 DAYS FROM INVOICE 

APPLY NOW
Aspire Lux Jointly Owned Property Management Services LLC
Aspire Lux Jointly Owned Property Management Services LLC
02 Residences by NED Al Ghurair
02 Residences by NED Al Ghurair
Residential

District 1, Jumeirah Village Triangle (JVT), Dubai, United Arab Emirates

Share