IVY Tower - Waterproofing Works at the Roof Level Glass Room

Break Down
Posted On: October 29, 2026
Closing On: November 5, 2026
JOB REFERENCE:
JB6711-26-00715
S/N Item Description of Work
1 Removal of Existing Waterproofing & Paint System Remove the existing waterproofing layer and painting system down to the top of the combo system.
2 Joint Preparation & Crack Filling Remove the existing fillers and fill the cracks with waterproof sealant between the joints and the aluminium
glazing curtain wall at roof level, inside the glass room only.
3 Primer & Double-Layer SBS Membrane – 155 sqm Supply and apply one coat of primer and lay double layers of 4 mm SBS membrane (180 gsm) – 155 sqm.
4 Protection Board – 155 sqm Supply and apply one layer of protection board over the new membrane – 155 sqm.
5 Drain Outlet Repair Repair the drain outlet termination and fill the cracks around it.
Terms & Condition

30 DAYS FROM INVOICE 

APPLY NOW
Aspire Lux Jointly Owned Property Management Services LLC
Aspire Lux Jointly Owned Property Management Services LLC
The IVY Tower
The IVY Tower
Residential

District 5 of Jumeirah Village Triangle (JVT), Dubai, United Arab Emirates

Share