Ground Floor Service Lift Entrance Modification & Renovation Work


  • Site Protection to done and follow workplace safety procedures.
  • Demolition of the wall in the ground floor service lift area.
  • Demolition of the wall at the ground floor parking area for entrance.
  • Removal of floor and wall tiles in the service corridor.
  • Removal of floor tiles in the garbage room (New Corridor area).
  • Construction of a block wall partition in the garbage room, including finishing.
  • Supply and installation of floor and wall tiles in the new service corridor.
  • Supply and installation in wall tiles in New wall in Garbage room side with wall protection
  • Supply and installation of a new fiber cement board ceiling
  • Supply and installation of a gypsum ceiling with LED lights.
  • Supply and installation of with lighting in the new service corridor.
  • Supply and installation of a new double-leaf door with a frame and 40x40 glass view at the parking entrance.
  • Supply and installation of a new double-leaf door with a frame and 40x40 glass view at the residential lift lobby entrance.
  • Supply and replacement of the aluminum ceiling in the service lift lobby.
  • Drawing modifications and all necessary DM approvals to be obtained by the vendor.
  • Submission of all approved drawings by the vendor.

Community details:
Building: Horizon Tower
Location: Marsa Street, Dubai Marina
Site Contact details: Engr. Ramana - 050 272 5615
Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
APPLY NOW
SAGA International
SAGA International
Horizon Tower Jointly Owned Property
Horizon Tower Jointly Owned Property
Residential

Horizon Tower Dubai Marina, Dubai, United Arab Emirates

Share