Firefighting & Fire Alarm System Rectification
Services
Posted On:
October 24, 2024
Closing On:
November 24, 2024
JOB REFERENCE:
JB007-24-03050
Firefighting & Fire Alarm System Rectification
Fire System: GST Brand
FACP: FIREX
S.No | Description | Qty |
FIRE ALARM SYSTEM | ||
1 | Replacement of Smoke detector with base | 12 No's |
2 | Replacement of Sounder control module | 1 No |
3 | Replacement of Single input module | 1 No |
4 | Replacement of Speaker ceiling type brand: Bosch | 2 No |
5 | Replacement of Heat detector | 5 No's |
6 | Replacement of Metal Column Speaker | 1 No |
7 | Replacement of Sounder base | 4 No's |
8 | Supply of Smoke detector with base (spare) | 20 No's |
9 | Supply of Heat detector with base (spare) | 20 No's |
10 | Supply of Sounder (spare) | 10 No's |
FIRE FIGHTING SYSTEM | ||
11 | Replacement of Landing valve hose | 2 No's |
12 | Replacement of Landing valve cup | 1 No |
13 | Replacement of 1" Gate valve | 26 No's |
14 | Replacement of Fire hose reel nozzle loc: 12th floor lift lobby | 1 No |
15 | Replacement of 6" Butterfly valve | 1 No |
16 | Replacement of manual fire hose reel | 6 No's |
FIRE PUMP | ||
17 | Replacement of Pressure switch 16 bar | 1 No |
18 | Suction line leak rectification by replacing 6"Pipes, fittings and necessary accessories including welding | 1 No |
19 | Landing valve socket leakage rectification | 2 No's |
20 | Replacement of Diesel tank hose | 1 No |
21 | Replacement of Level tube | 1 No |
FIRE EXTINGUISHERS | ||
22 | Refilling DCP 12kg | 2 No's |
23 | Replacement of Co2 5 lbs horn | 6 No's |
24 | Replacement of Co2 5Kg horn | 4 No's |
25 | Supply & Fixing Co2 5kg loc: telephone room | 44 No's |
26 | Supply & Fixing DCP 4KG LOC: Gym and Swimming pool area | 5 No's |
27 | Supply & Fixing CO2 5KG LOC: Gym and Swimming pool area | 5 No's |
Community Details
Building Name: Horizon Tower
Location: Marsa Street, Dubai Marina
Site Contact: Mr. Ramana (Facilities Engineer) - 050 272 5615
Terms & Condition
No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
As per standards
APPLY NOW
SAGA International
Horizon Tower Jointly Owned Property
ResidentialHorizon Tower Dubai Marina, Dubai, United Arab Emirates