East Villa Swimming pool - Damaged tiles replacement work.

Break Down
Posted On: December 5, 2025
Closing On: December 15, 2025
JOB REFERENCE:
JB2821-25-00870

Dear Esteemed Service Provider,

 

Greetings from PID Owners Association Management.

 

We would like to invite your company to provide a proposal for East Villa Swimming pool - Damaged tiles replacement work.

 

Scope of Work


·         Carefully remove existing damaged, broken, and uneven tiles.

·         Dispose of removed tiles and related debris in accordance with local waste disposal regulations.

·         Remove old grouts, mortar bedding, and loose materials completely.

·         Excavate and level the base layer where settlement has occurred.

·         Compact and stabilize the sub-base to ensure proper leveling and avoid future settlement.


Tile Installation

·         Supply and installation of new heavy duty Porcelain Tile Matt (same as existing color or approximate matches) Suitable for outdoor anti-slip floor tiles, matching the existing tiles color,       design, and pattern.

·         Ensure correct spacing and alignment using spacers or tile leveling systems.

·         Cut tiles to fit corners, edges, and fixtures neatly.


Grouting and Sealing

·         Apply grout evenly entire deck area and clean excess.

·         Clean the tile surface thoroughly after installation.


Finishing and Touch-up

·         Conduct a final clean-up of the workspace.

 

SL No.

Location

Damaged Area Tile Replacement

Full Area Tile Replacement

Tile Size

1

Swimming Pool 1

30 Sq M

350 Sq M

30 cm x 30 cm

2

Swimming Pool 2

35 Sq M

350 Sq M

30 cm x 30 cm

3

Swimming Pool 3

55 Sq M

350 Sq M

30 cm x 30 cm

4

Swimming Pool 7

50 Sq M

350 Sq M

45 cm x 45 cm

10 cm x 10 cm (for edges, borders)

5

Swimming Pool 8

50 Sq M

350 Sq M

45 cm x 45 cm

10 cm x 10 cm (for edges, borders)

 

 













Please note that we require two separate proposals: one for the Damaged Area Tile Replacement and another for the Full Area Tile Replacement.


Please include the following in your proposal

  • Product specifications (dimensions, materials, features, Weather-resistant ,etc.)
  • Pricing details
  • Delivery timeline
  • Warranty and after-sales support (if any)

 

Proposal Submission Details:

Submission Deadline: 06th December 2025, before 11:00 AM

Proposal: Softcopy via this same email

 

Site Location & Contact Person for Site Survey:

Location: Security Entrance office - Near Metro gate 

Contact Person: Mr. Anoop: +971 56 835 8855 (only for site assistance)

 

We highly recommend that your team conduct a site survey to ensure your proposal reflects and meets the projects SOW. All enquiries or requests for clarification must be sent strictly via email to: facilities@pidoam.com. Please let us know if any additional information is required.


We appreciate your cooperation and look forward to your prompt submission.

 

 

Thanks & Regards,

Terms & Condition

NOTE TO VENDORS

As per the rules, all vendors supplying services in the Emirate of Dubai must have trade license issued by relevant authority in the Emirate of Dubai. 
Before you apply for any job in the Emirate of Dubai, please make sure to comply with regulatory requirements. 
Failure to do so can result in stoppage of funds through Escrow Account.
PID-OAM bears no liability towards any payment that is withheld by the Escrow Operator.
APPLY NOW
PID OWNERS ASSOCIATION MANAGEMENT L.L.C
PID OWNERS ASSOCIATION MANAGEMENT L.L.C
Green Community East Villa
Green Community East Villa
Residential

Green Community East Villa DIP, Dubai, United Arab Emirates

Share