Consultancy Services for Delta T Improvement
ServicesJOB REFERENCE:
JB007-25-03298
Project: Delta T Improvement Study and
Consultancy – Royal Oceanic, Dubai Marina
**Client: Royal Oceanic Jointly Owned
Property / Asteco
1. Project Background
Royal Oceanic, located in Al Falea Street, Dubai Marina, is facing low
chilled water Delta T issues. This has led to inefficient cooling performance
and a notice from EMPOWER regarding potential penalties starting August 2025.
The tower is equipped with:
- Siemens Desigo BMS System
- FAHUs, AHUs, and FCUs serving common and residential areas
- Chilled water supply by Empower, with submetering via Aquacool
2. Consultancy Objective
To appoint a qualified MEP or Energy
Efficiency Consultant to:
- Analyze the current Delta T issue
- Diagnose technical and operational inefficiencies
- Develop detailed engineering solutions
- Prepare tender documents for implementation
- Provide support through tendering, evaluation, and supervision
3. Scope of Consultant’s Services
Stage 1: Site Assessment & Technical
Study
·
- Conduct physical inspection
of ETS room, pumps, heat exchangers, valves, controls
- Review as-built drawings, historical data (DEWA, Empower, BMS)
- Study BMS configuration, logic, and Delta T trend history
- Analyze submetering (Aquacool) and identify gaps
Stage 2: Diagnosis & Feasibility Report
·
- Identify root causes (e.g.,
flow imbalance, coil fouling, faulty valves)
- Assess performance of key HVAC assets
- Submit a technical report with baseline values and ECMs
Stage 3: Design & Tender Documentation
·
- Develop concept design
- Prepare RFP for implementation (BOQ, specs, drawings)
- Define Delta T targets and system requirements
Stage 4: Tendering Support
·
- Assist in issuing RFP to
vendors
- Evaluate submissions and submit comparison report
- Support contractor selection
Stage 5: Post-Award Support
- Review submittals and attend site
meetings
- Provide commissioning and M&V support
4. Expected Deliverables
·
- Site Assessment Report
- Root Cause Analysis Report
- Design & Justification Report
- Tender Package
- Technical Evaluation Matrix
- M&V Framework
5. Target Timeline
The consultancy engagement should be
completed within 6–8 weeks, excluding post-award support.
6. Prequalification Requirements
·
- Experience in Delta T or
chilled water optimization in the UAE
- Familiarity with district cooling systems and EMPOWER
- Experience with Siemens BMS / integrators
- Minimum 2 references for similar projects
7. Submission Requirements
·
- Company Profile and Trade
License
- Team CVs (Energy Engineers/HVAC specialists)
- Methodology and project approach
- Commercial proposal (separately)
- Sample M&V or Delta T report
Community Details:
Royal Oceanic: 2B + G + 32 + Roof
Terms & Condition

Asteco (operated under License by SAGA International Owner Association Management Services LLC)

Royal Oceanic Jointly Owned Property
ResidentialRoyal Oceanic, Dubai Marina, Dubai, United Arab Emirates