Chillers, HVAC, FAHU, FCU Break Down
Break DownJOB REFERENCE:
JB1099-25-02107
Greetings
from Strata Global!
We
kindly invite you to tender for Rectification of Chiller 4 in the
evaporator in Marina Arcade located in Dubai Marina.
For
site inspection and clarifications, please contact Mr. Shrinath (FM Engineer) +971 50 9709840.
Technical Details:
CHILLER
-4: COOLER LEAK REPAIR & REPLACEMENT OF TOUCH PILOT DISPLAY
Model: 30XA1212
Serial No: M2015023352
Scope
details:
Ø Mobilize to the
site with required tools and materials.
Ø Isolate the
chiller from electrical source.
Ø Open the end cover
of evaporator.
Ø Perform eddy
current and identify the number of tubes with leakage.
Ø Report the no. of
tubes identified defective as per Eddy Current Analysis Report.
Ø Wait for
customer’s advise to plug the tubes or replace them.
Ø Supply &
replacement of touch pilot display.
Ø Start the chiller
and log the parameters.
Ø Handover the
system to customer with recommendations.
Ø Demobilization
from the site and housekeeping.
Please make sure to mention
in your proposal the following below:
- Payment terms
- Warranty
- Completion date
Thank you & warm
regards,
Procurement Team
Terms & Condition
Payment Terms: 100% after completion

SG Community Management Services LLC

Marina Arcade
Mixed UseDubai Marina, Dubai, United Arab Emirates