Building Signage Rectification -2 No
Services
Posted On:
August 28, 2025
Closing On:
September 2, 2025
JOB REFERENCE:
JB007-25-03685
Fabrication & Installation of Signage Units (Qty: 2)
- Construct 10 cm frame ACP aluminum cladding color as per the current
signage.
- Install 10 mm engraved acrylic letters.
- Apply brushed gold stainless steel face SS Grade 316.
- Include LED strip lighting system with transformer and timer.
- Power Cable pulling and termination near Signage .
Repair of Existing Signages -2 NO
- Replacement of damaged and missing letters and lighting
Terms & Condition
No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
As per standards
Payment will be done after 30 days work completion upon submitting the invoice along with work completion/service reports/warranty certificates.
APPLY NOW

Asteco (operated under License by SAGA International Owner Association Management Services LLC)

Royal Park South Jointly Owned Property
ResidentialJumeirah Village Circle Dubai, UAE, Dubai, United Arab Emirates