Annual Maintenance Contract for Garbage Chute (01st Jan 2026 to 31st Dec 2026) - Plazzo Residence
Contract
Posted On:
August 21, 2025
Closing On:
August 31, 2025
JOB REFERENCE:
JB004-25-02554
Scope of Work
Asset Description:
- 1
Nos. Garbage Chute System (Building Floor Model: B+G+4+R)
- 3
Nos. Garbage Trolleys
Service Frequency:
- Monthly
– 12 times/ Year
- Chute
High-Pressure Washing and disinfection- Quarterly- 4 times/ Year
- Breakdown
calls - Unlimited
Consumables and Spare Parts:
- Comprehensive
- Maintain
a reasonable inventory of essential spare parts for maintenance and
services falling within the scope of services.
- PPM
consumables shall be included in the service.
- Exclusion-
Replacement of offset/Deflector, Hopper Doors & external water leakage
Emergency Response:
Priority 1 – Emergency: Immediately (Within 2
hours)
- Incident
requires urgent interference.
Priority 2 – Urgent: Within 4 hours
- Poses
a threat of personal injury, equipment damage, or serious disruption of
operations.
Priority 3 – Expedited: 8 Hours
- Something
that is not classified as urgent but needs to be resolved speedily e.g. a
situation that reflects poorly on the Client.
Priority 4 – Scheduled: 24 Hours
- Nonurgent
to operations. Date scheduled, chargeable works requiring prior client
approval
Note: Technical assistance via phone calls shall be
provided to the building security or FM team immediately if required.
Scope of Work:
System Maintenance
- Lubricating
exhaust fan and replacement in case of repair.
- Door
closer magnetic lock replacement if faulty.
- Door
closer jack replacement if faulty.
- Hopper
Door welding if broken.
- Door
indicators replacement if faulty or broken.
- Electric
connection rectification within the chute if faulty.
- Fire
door springs and fusible link replacement if broken.
- Control
panel electrical and electronic component repair and replacement.
- Trolley
wheels replacement only.
- Elbow/deflector
welding works if any.
- Check
the water cleaning system for the garbage chute.
- Period
checking for all Garbage chute duct, sealant, and operation.
- The
report should be issued by the end of each visit and the forms to be
approved by the Client.
Washing
- All
chute doors will be cleaned with Non-Hazardous Chemicals Floor-by-Floor -
Internal & External.
- Chute
duct will be sprayed with chemicals and will be cleaned manually till you
have access.
- Chute
duct will be cleaned with HP water - subject to water provision on each
floor in the garbage room.
Safety Policy:
- Workforce
shall be provided with proper uniform, hand gloves, face mask, and other
safety equipment to be used while duty.
- Shall
take special care to seclude the area of our work by proper partition and
provide signboard in work.
- Clean
the area completely after completion of the work and never leave tools,
waste, etc. at the worksite.
- Vendor
is solely responsible for any liability that may arise due to the injury
sustained to its employees during their work under this agreement.
APPLY NOW

HOAM- Highrise Owners Association Management

Plazzo Residence
ResidentialPlazzo Residence, Jumeirah Village Triangle, Dubai, United Arab Emirates