1st Floor Pergola – Wooden Roof Structure: Repair and Replacement
Services
Posted On:
April 24, 2025
Closing On:
May 5, 2025
JOB REFERENCE:
JB007-25-01219
Pergola –
Wooden Roof Structure Repair and Replacement of WPC floor
Scope of Work
- Inspect, repair, and replace all damaged wooden
components of the pergola structure.
- Supply and apply waterproof and weatherproof paint on
the entire wooden structure.
- Supply and install IP67-rated LED lights, including
proper cabling and electrical connections.
Pergola – Flooring
- Dismantle and remove the existing wooden flooring and
structural elements.
- Supply and install a new base structure suitable for
WPC (Wood Plastic Composite) flooring.
- Supply and install new WPC flooring (waterproof and
weatherproof).
- Supply and install IP67-rated wooden floor lights with
complete new wiring.
1st Floor Wooden Bridges (2 Nos.)
- Dismantle existing wooden flooring and side structures
of both bridges.
- Remove existing paint, sand, and clean all CI/GI
surfaces thoroughly.
- Apply primer to metal surfaces where required.
- Supply and apply waterproof brown wood paint, matching
the pergola’s finish.
- Supply and install new WPC flooring with appropriate
supporting structures.
- Supply and install new wooden side structures for the
bridges.
General Notes
- All work must comply with quality standards and safety regulations.
- Proper finishing and long-term durability are to be
ensured.
- A comprehensive warranty must be provided for all
supplied and installed materials and works.
Site Contact Details:
- Building Name:
Horizon Tower
- Location:
Marsa Street, Dubai Marina
- Site Contact:
Engineer Ramana – 050 272 5615
Terms & Condition
No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
APPLY NOW

SAGA International

Horizon Tower Jointly Owned Property
ResidentialHorizon Tower Dubai Marina, Dubai, United Arab Emirates