(12 Months) Water Feature & Lakes Contract
Contract
Posted On:
September 11, 2025
Closing On:
September 23, 2025
JOB REFERENCE:
JB6913-25-00245
AMC for Hot Water System - Quarterly PPM and Monthly Inspection
Scope of Work
• Physical damage in the tank, insulation, and pipe
• Boiler - Leakage and joints
• Exchanger - Leakage and joints
• Circulation pump station leaks and joints
• Support Structures - Paint, bending, welding, joints, screws, and bolts
• Manual and Auto Valves
• Piping Network
• Electrical Wiring
• Heat Transfer Fluids
• Anode
• All circulator
• Expansions vessel
• Ignition and combustion chamber and system
• Boiler pump, gas valve, boiler fan, and controller
• Storage Tanks - Heat Exchanger, gasket, and anode (once in year)
• Flue gas line leakage
• Flue gas analysis (once in year)
• All safety items: PT and pressure relief valves
• Control system and sensors
Cleaning to cover the following:
• Cleaning of strainers if necessary
• Cleaning of boiler inside (once in year)
• Cleaning of calorifier with certification (once in year)
• Flushing of the complete system (once in year)
• Submit quarterly reports detailing inspection results, corrective actions, and recommendations.
APPLY NOW

Professional Choice Real Estate LLC
Dolphin Tower
Mixed UseThe First Collection Water Front -Dolphin Tower, Dubai, United Arab Emirates