(12 Months) Gate Barrier Contract

Contract
Posted On: September 11, 2025
Closing On: September 23, 2025
JOB REFERENCE:
JB6913-25-00247
AMC for Gate Barrier Systems – Quarterly PPM
Scope of Work
1. General Inspection & Testing
Inspect and test gate barrier units for proper operation
Verify smooth and consistent movement of barrier arms
Check alignment, speed, and responsiveness of barrier operation
Inspect barrier housing for physical damage, rust, or wear
2. Electrical & Control Systems
Inspect and test all cables, connectors, and wiring for damage or loose connections
Check control devices (push buttons, access control panels, RFID readers, etc.)
Test transmitter and receiver (TX/RX) devices for signal strength and responsiveness
Inspect transmitter antennas for physical damage and serviceability
Check magnetic loop detectors and sensors for proper operation
Test backup batteries for safety devices and emergency operation
Verify power supply stability and surge protection systems
3. Mechanical Maintenance
Lubricate all moving parts including barrier arm joints, motor shafts, and gear mechanisms
Inspect barrier arm for cracks, bends, or structural damage
Ensure barrier arm markings are visible, reflective, and in good condition
Clean and remove dust, dirt, and debris from all components and enclosures
Check for water ingress or corrosion in underground or exposed components
4. Safety & Compliance
Test emergency stop and manual override functions
Verify safety sensors and auto-reverse mechanisms
Ensure compliance with local safety standards and hotel operational protocols
5. Corrective Maintenance
Rectification of ordinary faults due to fair wear and tear
Minor repairs and adjustments during routine service visits
Emergency breakdown support within 24 working hours
Documentation of faults and repairs performed
6. Major Repairs & Common Issues (parts excluded in the contract but service and installation should be included in AMC scope)
Replacement of damaged barrier arms or motor assemblies
Repair of faulty control boards or access systems
Replacement of worn-out magnetic loop detectors
Repair or replacement of broken TX/RX units or antennas
Replacement of backup batteries or power modules
Rewiring or replacement of damaged cables due to rodents, weather, or vandalism
Structural repairs to barrier housing or mounting base
Software reconfiguration or firmware updates (if applicable)
APPLY NOW
Professional Choice Real Estate LLC
Professional Choice Real Estate LLC
Dolphin Tower
Mixed Use

The First Collection Water Front -Dolphin Tower, Dubai, United Arab Emirates

Share