(12 Months) Gate Barrier Contract
Contract
Posted On:
September 11, 2025
Closing On:
September 23, 2025
JOB REFERENCE:
JB6913-25-00247
AMC for Gate Barrier Systems – Quarterly PPM
Scope of Work
1. General Inspection & Testing
• Inspect and test gate barrier units for proper operation
• Verify smooth and consistent movement of barrier arms
• Check alignment, speed, and responsiveness of barrier operation
• Inspect barrier housing for physical damage, rust, or wear
2. Electrical & Control Systems
• Inspect and test all cables, connectors, and wiring for damage or loose connections
• Check control devices (push buttons, access control panels, RFID readers, etc.)
• Test transmitter and receiver (TX/RX) devices for signal strength and responsiveness
• Inspect transmitter antennas for physical damage and serviceability
• Check magnetic loop detectors and sensors for proper operation
• Test backup batteries for safety devices and emergency operation
• Verify power supply stability and surge protection systems
3. Mechanical Maintenance
• Lubricate all moving parts including barrier arm joints, motor shafts, and gear mechanisms
• Inspect barrier arm for cracks, bends, or structural damage
• Ensure barrier arm markings are visible, reflective, and in good condition
• Clean and remove dust, dirt, and debris from all components and enclosures
• Check for water ingress or corrosion in underground or exposed components
4. Safety & Compliance
• Test emergency stop and manual override functions
• Verify safety sensors and auto-reverse mechanisms
• Ensure compliance with local safety standards and hotel operational protocols
5. Corrective Maintenance
• Rectification of ordinary faults due to fair wear and tear
• Minor repairs and adjustments during routine service visits
• Emergency breakdown support within 24 working hours
• Documentation of faults and repairs performed
6. Major Repairs & Common Issues (parts excluded in the contract but service and installation should be included in AMC scope)
• Replacement of damaged barrier arms or motor assemblies
• Repair of faulty control boards or access systems
• Replacement of worn-out magnetic loop detectors
• Repair or replacement of broken TX/RX units or antennas
• Replacement of backup batteries or power modules
• Rewiring or replacement of damaged cables due to rodents, weather, or vandalism
• Structural repairs to barrier housing or mounting base
• Software reconfiguration or firmware updates (if applicable)
APPLY NOW

Professional Choice Real Estate LLC
Dolphin Tower
Mixed UseThe First Collection Water Front -Dolphin Tower, Dubai, United Arab Emirates