1 YEAR HOT WATER SYSTEM MAINTENANCE CONTRACT

Contract
Posted On: December 22, 2025
Closing On: December 26, 2025
JOB REFERENCE:
JB6913-25-00483
Hot Water calorifiers System – 4x EP 5000L Ariston Tanks with 2x 100kW HP Ariston Boilers, 1x 115kW HP Ariston Boiler, Heat Exchanger, and Circulation Pump Set with Controller

AMC for Hot Water System - Quarterly PPM and Monthly Inspection
Scope of Work                                                                                                                                                                               
Physical damage in the tank, insulation, and pipe
Boiler - Leakage and joints
Exchanger - Leakage and joints
Circulation pump station leaks and joints
Support Structures - Paint, bending, welding, joints, screws, and bolts
Manual and Auto Valves
Piping Network
Electrical Wiring
Heat Transfer Fluids
Anode
All circulator
Expansions vessel
Ignition and combustion chamber and system
Boiler pump, gas valve, boiler fan, and controller
Storage Tanks - Heat Exchanger, gasket, and anode (once in year)
Flue gas line leakage
Flue gas analysis (once in year)
All safety items: PT and pressure relief valves
Control system and sensors
Cleaning to cover the following:
Cleaning of strainers if necessary
Cleaning of boiler inside (once in year)
Cleaning of calorifier with certification (once in year)
Flushing of the complete system  (once in year)
Submit quarterly reports detailing inspection results, corrective actions, and recommendations.
APPLY NOW
Professional Choice Real Estate LLC
Professional Choice Real Estate LLC
Dolphin Tower
Mixed Use

Dolphin Tower Jointly Owned By Professional Choice Real LLC, Dubai, United Arab Emirates

Share