Search Jobs
Break Down
Mixed Use
Tamweel Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement
of damaged parts for Booster and Transfer pump:
Location: Roof – Booster Pump room
2 1/2" Check Valve - PN25 Crane –
2 nos.; D140 2.5" Bronze swing threaded, resilient disc PN252 1/2" Hex Nipple – 4 nos.; Sch40s,
Threaded male BSPT BS2175mm HDPE Flange Adaptor – 4 nos.; Flange
Adaptor SDR 92 1/2" GI Backing Ring...
MEP Services 2026 (JB007-25-02289)
Contract
Residential
Dubai Gate 1 Cluster Q Jumeirah Lakes Tower, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear
Service Providers,
Greetings from ASTECO!
We are seeking a proposals for MEP AMC at
Dubai Gate 1, located in Cluster Q JLT, Dubai.
For clarification and site visit,
please contact of Mr. Binumon at 050 726 7886. Manpower:-* FM Engineer -1* HVAC Technician-1* Multi Technician-1* Plumbe...
Mechanical Electrical Plumbing (MEP) Contract 2026 (JB007-25-02351)
Contract
Residential
Dubai Gate 2 Cluster A Jumeirah Lakes Tower, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear
Service Providers,
Greetings from ASTECO!
We are seeking a proposals for MEP AMC at
Dubai Gate 2, located in Cluster A JLT, Dubai.
For clarification and site visit,
please contact of Mr. Yasir-050 469 8400.
Detailed SOW is attached.(quote for MEP services only)Manpower:-* FM Engi...
Contract
Commercial
Prime Tower 6C Marasi Dr - Dubai , Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Scope of Work:• Monthly servicing of 30 nos. urinal including replacement of cartridge.• Cleaning using concentrated biological cleaning solution.• Replace any damaged plumbing fittings.• Check for any leakage.• Attend emergency call out.Any clarifications/inquiries, kindly contact our FM on-site Engi...
Supply and Replacement of FAHU - Bahia 2 (JB004-25-02003)
Break Down
Residential
Bahia 2 Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1. Project Overview
The Contractor shall execute a turnkey solution for the full replacement of the existing DX-type FAHU including removal, supply, installation, testing, commissioning, and integration with existing building services and controls. The replacement unit shall meet or exceed all specified technical parameters a...
Repairing of Booster Pumps and Panel - Oxford Residence (JB004-25-02065)
Break Down
Residential
Oxford Residence, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1. 5.5KW 380V 3Phase 2800RPM) Pump 1 & 2 – 2 nos.
*Insulating Electric Supply
*Removing Stator from The Pump
*Transporting, Loading, Unloading from and to The Site
* Stator Rewinding With 200° C Dual Coted Copper Enamelled
Wire
* Varnishing with Class "F" Insulation
*Oven ...
(1 Years) Mechanical Electrical Plumbing (MEP) Contract (JB1099-25-01672)
Contract
Residential
Barsha Heights, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear
Bidders,
Hope this
email finds you well.
We would like to invite you to do the site visit and
submit the AMC proposal for “MEP Services” for the 2026 budget. Please refer
attached RFP document.
Project Name : “Madison Residency” located in Barsha
Heights, Dubai
Scope : MEP Services
Fo...
Break Down
Residential
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Work Description
This scope covers the supply, installation, testing, and commissioning of LED lighting systems to replace the existing conventional lighting at Indigo Tower, including the façade, reception areas, signage at the main entrance (ground level), and 10th floor. The work will be executed with minimal disruption to...
Booster Pump Rectification Work - Dragon View (JB004-25-02037)
Break Down
Residential
Dragon Views, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply and replacement of the booster pump – Type EBARA (3D-40-160/30) -02 Nos -3 KWSupply and replacement of the following items.Pressure switch• Pressure Gage -3 bar• Control Panel• Pressure Tank (PWB-100LV -10 bar/150 psi)• 2 Inch Gate Valve 2-nosOther Necessary fitting.Warranty and Workmanship Warranty
Services
Residential
Saba Tower 2 Cluster Q Jumeirah Lakes Tower, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Please find the attachment.
MEP Contract (JB007-25-02538)
Contract
Residential
Saba Tower 2 Cluster Q Jumeirah Lakes Tower, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service provider,Greetings from ASTECO!You are kindly advised to submit proposal for the mentioned service.Scope of work: Please find the attachment.Contract period : 1st January 2026 to 31st December 2026.Kindly visit the site for Asset Verification.-Manpower details as per attached/below:Facilities Engineer...
Mechanical Electrical Plumbing (MEP) Contract (JB007-25-02507)
Contract
Mixed Use
Marina Wharf Tower 2 Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service provider,Greetings from ASTECO!You are kindly advised to submit proposal for the mentioned service.Service: MEPScope of work: Please find the attachment.The manpower required for the facility shall be provided based on demand and requirement to meet the service levels. MEP Supervisor, MEP Team&nbs...
Break Down
Residential
Pantheon Boulevard, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
RFP ref no.JB004-25-01779 (RF)Supply and replacement of Corridor lights and motion sensors - Pantheon BoulevardScope of work:1.Property Observer required for Variable work to process Reserve Fund Inspection. 2.Pre and Post inspection reports need to be submitted.
Break Down
Residential
La Riviera Azure, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply and installation of the below plumbing materials:1. PVC High Pressure 4-inch Tee2. PVC High Pressure 4-inch Sockets3. PVC High Pressure 4-inch Flanch Adaptor4. 4-inch Butterfly valve5. Reducer Bush 4x36. PVC High Pressure 3-inch Sockets7. PVC High Pressure 4-inch Pressure8. 3-inc...
Elevator Component Repair and Replacement at Dragon View (JB004-25-02009)
Break Down
Residential
Dragon Views, International City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Component ReplacementRemove defective parts:Main drive contactor PCBFaulty position switchInstall new components as per the manufacturer's standards1 × KDL16S contactor PCB1 × Position switchPost-repair observation and fault monitoring.Conduct operational tests to confirm issue resolution.Return the lift to full, fault-free s...
Mechanical Electrical Plumbing (MEP) Contract (JB007-25-02484)
Contract
Mixed Use
Marina Wharf Tower 1 Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service provider,Greetings from ASTECO!You are kindly advised to submit proposal for the mentioned service.Service: MEPScope of work: Please find the attachment.The manpower required for the facility shall be provided based on demand and requirement to meet the service levels. MEP Supervisor, MEP Team&nbs...
Ceiling Repair and CHW Pipeline Insulation (JB007-25-02410)
Services
Residential
Dubai Gate 2 Cluster A Jumeirah Lakes Tower, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
As per attached document.1. Project OverviewThis project involves the repair of ceiling systems and insulation of chilled water (CHW) pipelines to enhance operational efficiency, safety, and aesthetics. The scope includes supply, removal, installation, and painting of insulation and ceiling components, as well as complete lif...
Break Down
Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of workConduct a thorough inspection of the pressurization unit and its control panel.
Identify root causes for auto mode malfunction, including control logic issues, faulty sensors, timer relays, control modules, or communication errors.Testing & Commissioning:
Perform functionality test of the unit in both man...
AMC of MEP Services ( Residential) for 2026 (JB007-25-02249)
Contract
Residential
Laguna Tower Cluster A Jumeirah Lakes Tower, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service
Providers, Greetings from
ASTECO! We would like
to request for proposal based on the attached scope of work of MEP
Services (Residential Only) for our building Laguna Tower Located in JLT
cluster A Dubai. Building is comprised of 3 Basements + GF+9-42+ Roof top. Contract: 3
years (J...
FM & MEP Services (AMC) 2025 (JB2190-25-00097)
Contract
Mixed Use
Jumeirah Lake Towers, Cluster T, Dubai, United Arab Emirates
Posted By: ITIHAD COMMUNITY MANAGEMENT
(ATTACHED IS THE RFP DETAILING THE COMPLETE SCOPE OF WORKS)SECTION 1GENERAL REQUIREMENTS:MECHANICAL, ELECTRICAL, PLUMBING, GENERAL CIVILS AND SPECIALIST SERVICES INCLUDING FACILITIES ADMINISTRATION AND SUPERVISION IN RELATION TO SERVICE REPORTS, TEST RESULTS, CERTIFICATES, O&M DOCUMENTS AND TECHNICAL LIBRARIES.1) ...
Break Down
Residential
SILICON ARCH, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of Corridor Ductable AC System – Silicon Arch Residence, 9th FloorTo replace the failed ductable split AC unit serving the 9th floor corridor due to compressor failure and outdoor coil leakage caused by corrosion and poor air quality. The replacement shall ensure energy-efficient performance, long service life, an...
Break Down
Residential
Bahia 2 Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Site Access and PreparationCarefully dismantle sections of the ceiling and riser shaft enclosure to provide adequate access for pipe removal and installation.Implement appropriate safety measures and protective coverings to prevent damage to adjacent areas.Supply and Installation of Piping SystemSupply and install new copper ...
Supply and Replacement of Existing door Unit - LV2 (JB004-25-01895)
Break Down
Residential
La Vista Residence 2, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Conduct a preliminary site inspection to assess the existing condition and prepare the area for safe and effective door replacement.Protection of adjacent finishes, surfaces, and furnishings to prevent any damage during the work process.Carefully dismantle and remove the existing door and frame assembly.Proper disposal of all...
Break Down
Residential
SILICON ARCH, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Make/Model: DOR MATE – Heavy Duty Floor Hydraulic Door Closer - 1noDismantling and removal of the existing DOR MATE heavy-duty floor hydraulic door closer and latch fittings.Supply of a new heavy-duty floor-mounted hydraulic door closer with equivalent or higher specifications.Supply of all required latch fittings, brackets, ...
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Rectification and refixing of façade copping panel at the roof swimming pool area by rope access - 2 nos.Application of weatherproof silicone sealant at all joints to ensure durability.Final quality check, site cleanup, and submission of completion report.including DMCC Master community permit
Contract
Residential
Mag 318 Residential Tower, Business Bay, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service Providers,Greetings from Asteco!We are the building management of MAG 318, located in Business Bay and would like to invite your good company to submit a proposal for MEP Services for the period 1st January 2026 to 31st December 2028.Manpower details: -Day: - 1. Multi technician2. Electrical t...
Break Down
Residential
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of workIsolation of the area with signage and barricading.• Protection of the existing assets.• Mobilization of required materials, tools, and equipments.• Debris removal and carting away as per DM regulations.• Removal of the damaged existing structures from the brackets and their disposal.• Sanding and surface pr...
Break Down
Residential
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work
The contractor shall undertake the following activities:
a. Site Survey & Dismantling
Conduct a site verification to confirm lamp quantities and access requirements.
Safely remove and dispose of:
62 nos. of 70W metal halide lamps in the lobby ceiling (only 4 working).
20 nos. of 70W metal halide lamp...
Supply and Replacement of Lift Cabin Floor Tile - The Pinnacle (JB004-25-01641)
Break Down
Mixed Use
Dubai Hills Estate, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Passenger Lift number -2ndInspect lift cabin to assess the current flooring condition and take precise measurements.Carefully dismantle the current floor tiles.
Clean and level the subfloor to prepare for new tile
installation.
Ensure lift walls and
interior finishes are protected during the process.Provide high-durab...
Ceiling Repair and CHW Pipeline Insulation (JB007-25-01204)
Services
Residential
Dubai Gate 2 Cluster A Jumeirah Lakes Tower, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
As per attached document.1. Project OverviewThis project involves the repair of ceiling systems and insulation of chilled water (CHW) pipelines to enhance operational efficiency, safety, and aesthetics. The scope includes supply, removal, installation, and painting of insulation and ceiling components, as well as complete lif...
Supply and Installation of Fixed Bicycle Stand - Bermuda Views (JB004-25-01573)
Enhancement
Residential
Bermuda Views, Dubai Sports City, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply and Installation of Fixed Bicycle Stand - 10 NosManufacture fixed
bicycle stands using SS 304 stainless steel
Each stand must support five (5) bicycles,
allowing secure locking of both frame and wheel.Apply powder coatingThe finish must resist corrosion, UV fading, and abrasion. Instal...
Rectification Work of Façade Structure Panel - Goldcrest View (JB004-25-01572)
Break Down
Mixed Use
Goldcrest Views, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Management and supervision.• Protect proposed working area with proper barricading.• Logistics for material, equipment shifting.• Necessary precautions for protecting the existing assets.• Demobilization of the material and equipment after work.• Cart away all the debris to the DM disposal yardTightening of loosen façade stru...
Break Down
Residential
Villa Myra, Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1. Hot water Boiler tanks Cleaning and Pipeline Disinfection - 2 nos.Maker: PrecisionModel: PCY-2000LCapacity: 2000 LitersLocation: Roof
Break Down
Mixed Use
Apricot Tower Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope Of work30KW 40HP 4 Pole 1400RPM pump & motor repairing.Motor & pump dismantling and pull out from site.Motor stator rewinding with F class wire insulation and Nomexpaper as per winding standard.Fixing of new fiberglass wedges as per slot dimension.Fixing of new fiberglass coated high temperature flexible wi...
Break Down
Residential
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work
Removal of Faulty ACB
Disconnect the interconnection busbar links.
Carefully remove the existing faulty 2500A TP draw-out ACB.
Supply & Installation of New ACB
Provide and install a new Schneider Make 2500A TP draw-out ACB of the same rating.
Fabrication & Installation of Busbar Links
Fabricat...
Earth pit rectification works (JB007-25-00682)
Services
Residential
Sulafa Tower Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Please refer the attachments
Break Down
Residential
Centurion Residence, DIP Dubai Investment Park, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Location: Near Apartment 0051. Protection of working area.2. Removal of existing damage 2" GI pipe & Tee.3. Disposal of waste in DM approved dump yards.4. Supply & installation of new 2" GI pipe & Tee including reducer with associated materials &fittings.
West Wharf - Supply and installation of Calorifier-3 (JB007-25-00405)
Services
Residential
West Wharf Tower Business Bay, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Quantity: 1 no.Capacity: 900 Gal.Scope of Work:• Protect work area with proper barricading.• Drain the existing Calorifier and remove the insulation.• Isolate the power source and remove all the cables.• Dismantling of existing system (calorifier-3).• Preparation of platform• Supply and installation of new tank (Material-Stai...
Repairing of Chilled Water Pump No. 6 in 20F Plant Room (JB007-25-00316)
Break Down
Residential
Laguna Tower Cluster A Jumeirah Lakes Tower, Dubai, United Arab Emirates
Posted By: SAGA International Owner Association Management Services LLC
Dear Service Providers,Greetings from SAGA International!We would like to request a Proposal for Repairing of Chilled Water Pump No. 6 in 20F Plant Room for our building Laguna Tower located in JLT Cluster A Dubai.NOTE: WARRANTY MUST BE MENTIONED ON THE QUOTATIONFor site visit, please contact, Mr. Fanuiel (+971...
Break Down
Mixed Use
Atlantic Tower, Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1. Gate
Specifications
Gates to be Installed:
2 x Gates for Ground Floor:
Size: 1.25m (Width) x 1.95m (Height)
1 x Gate for Basement:
Size: 1.00m (Width) x 2.10m (Height)
Design: As per existing design,
maintaining uniformity with current gates.
Material: Cast Iron
Finish: White&n...
Break Down
Mixed Use
Atlantic Tower, Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
1. Gate SpecificationsGates to be Installed:2 x Gates for Ground Floor:Size: 1.25m (Width) x 1.95m (Height)1 x Gate for Basement:Size: 1.00m (Width) x 2.10m (Height)Design: As per existing design, maintaining uniformity with current gates.Material: AluminumFinish: White Total Quantity: 3 Gates2. Suppo...
Replacement of Fresh Water Tank Float Valve - PR (JB004-25-00468)
Break Down
Residential
Plazzo Residence, Jumeirah Village Triangle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Replacement of Fresh Water Tank Float Valve - Plazzo ResidenceLocation: Basement -01Scope of WorkThe scope of work involves replacing the defective 2-inch float valve and associated PVC fittings in the fresh water tank at Plazzo Residence. The tasks shall include the following:Inspection:Conduct a thorough inspection of ...
Break Down
Mixed Use
Atlantic Tower, Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Project Title:Resolution of Kitchen Bad Smell from Exhaust System at Atlantic Tower.Objective:To identify, address and resolve the issue of unpleasant smells emanating from the kitchen exhaust system, ensuring optimal air quality and compliance with building standards.Scope of WorkInspection and Assessment:Conduct a detailed ...
Break Down
Mixed Use
IT Plaza, Dubai Silicon Oasis, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of WorkWall Demolition at the Eighth Floor:Carefully demolish the specified wall on the eighth floor, ensuring minimal disruption to the surrounding structure and facilities.Remove all debris from the demolition site and dispose of it in compliance with local regulations.Cutting and Repairing the High-Pressure PVC Pipe:...