Search Jobs
(1 Years) Mechanical Electrical Plumbing (MEP) Contract (JB1099-25-02542)
Contract
Mixed Use
Dubai Land, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear
Service Providers,
Hope this email finds you well.
We would like to invite you to do the site visit and
submit the AMC proposal for “MEPServices” for the 2026 budget. Please
refer attached RFP document.
Project Name : “KOA Canvas” located in Wadi Al Safa 3, Dubailand
Scope : MEP Services
&nbs...
Break Down
Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of WorkLocation: 1)Main Road Side Sign, 2)Main Road Side Sign and 3)Main Road Side Sign- 3nos
A. Site Inspection & Preparation
Inspect all signage locations to confirm existing conditions.
Isolate power supply before commencing work.
Remove existing faulty or dim LED strip lights and transformers.
Clean the ...
Annual Maintenance Contract for MEP & Cleaning Services (2026) (JB004-25-03565)
Contract
Mixed Use
The Community, Jumeirah Village Triangle, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Annual Maintenance Contract for MEP & Cleaning ServicesManpower DeploymentFacility Engineer / Supervisor – 1 No. (Full Time)HVAC Technician – 1 No. (Full Time)Plumber – 1 No. (Full Time)Multi Technician – 1 No. (Day Shift)Multi Technician – 1 No. (Night Shift)Cleaning TeamCleaners – 4 Nos. (Day Shift)Cleaners – 1 No. (Nig...
Break Down
Mixed Use
Al Shera Tower, Jumeirah Lakes Towers, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Inspection & Assessment:
Examine the existing sunshade and steel structure on the staircase leading to the cradle area on the rooftop.
Assess the extent of damage and verify suitability for removal and replacement.
Dismantling & Removal:
Safely dismantle and remove the damaged sunshade and steel structure wi...
Break Down
Mixed Use
JLT, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work
The contractor shall carry out the following activities as part of the rectification works:
Dismantling and Site Preparation
Safely dismantle damaged scrubber units and associated components.
Clear and clean the existing area for new installation.
Dispose of damaged and chemical-contaminated materials in...
Break Down
Mixed Use
Dubai Hills Estate, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Isolation & Preparation
Isolate the chilled water system safely prior to valve replacement.
Drain the affected section of the pipeline and ensure safe working conditions.
Dismantling Works
Remove the existing defective DN125 PICV control valve and actuator.
Inspect the adjoining flanges and pipe connections fo...
The VYBE - AMC - MEP Services (JB6711-25-00512)
Contract
Residential
Jumeirah Village Circle, Dubai, United Arab Emirates
Posted By: Aspire Lux Jointly Owned Property Management Services LLC
The VYBE - Contract duration details:1. 20th June 2025 to 31st Dec 20252. 1st Jan 2026 to 31st Dec 20263. 1st Jan 2027 to 31st Dec 2027
Orchid Residence - AMC - MEP Services (JB6711-25-00522)
Contract
Residential
Dubai Science park - Al Barsha - Al Barsha South - Dubai, Dubai, United Arab Emirates
Posted By: Aspire Lux Jointly Owned Property Management Services LLC
As per attached Scope of WorkOrchid Residence - Contract Duration Details:1. 1st Sep 2025 to 31st Dec 20252. 1st Jan 2026 to 31st Dec 20263. 1st Jan 2027 to 31st Dec 2027
Break Down
Mixed Use
Dubai Hills Estate, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Scope of Work:
Upgradation of BTU Meter software, including the supply and installation of four (4) new gateways, and provision of engineering services for the complete configuration of all BTU meters on both the gateway and software interfaces.
Supply & Installation of Motion Sensors (Common Area) (JB007-25-04466)
Services
Residential
Royal Oceanic, Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owners Association Management Services LLC
SUPPLY AND INSTALLATION OF MOTION SENSORS IN PUMP ROOMS,
MECHANICAL ROOMS, ROOF TOP & CAR PARKING
Site
Survey & Design
Conduct a detailed site survey to identify lighting layouts,
lux requirements, and sensor locations.
Develop a sensor placement design ensuring maximum coverage,
minimal blind s...
Break Down
Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
Supply and replacement of new 2” PRV as per existing details:1. 2” PRV Flanged ends PN16 cast iron body - 3 nos.Brand: Conex Benninger2. Supply and fixing of new 2” semi lugged butterfly valve.Brand: Pegler3. Supply and fixing of new aqua grip flanged adapter.4. Supply and fixing of new PPR flange.5. Supply and fixing of new ...
Crystal Tower - Common Area Toilets Enhancement work (JB007-25-04386)
Enhancement
Commercial
Crystal Tower, Marasi Dr - Dubai, Dubai, United Arab Emirates
Posted By: SAGA International Owners Association Management Services LLC
Dear Service Provider, Greetings from Asteco! Scope of Work: Refer the attached Inspection report On Site FM Contact Person: Mr. Ragu (+971 54 324 0093)Regards,
Enhancement
Commercial
Crystal Tower, Marasi Dr - Dubai, Dubai, United Arab Emirates
Posted By: SAGA International Owners Association Management Services LLC
Dear Service Provider, Greetings from Asteco! Scope of Work: Refer the attached Inspection report On Site FM Contact Person: Mr. Ragu (+971 54 324 0093)Regards,
BBQ Area Rectification ( Supply&Civil) (JB2332-25-00885)
Contract
Residential
Grandeur Residences Palm Jumeriah, Dubai, United Arab Emirates
Posted By: Mansions Owners Association Management
BBQ Area is required to be repaired, new BBQ station installed and minor civil works done.Please refer to the attachment For site visiting please contact Imtiaz +971 52 998 6374
Sewer Chamber Leakage Rectification (JB007-25-04383)
Services
Residential
Royal Oceanic, Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owners Association Management Services LLC
Sewer Chamber Leakage RectificationSCOPE OF WORK1. Site Preparation: *Secure area and divert sewer flow. Dewater and clean chamber. 2. Repair Works: *Seal cracks/joints using appropriate materials. *Repair of damaged chamber sections and cover. *Apply waterproofing coating. 3. Testing:
*Perform l...
Mechanical Electrical Plumbing (MEP) Break Down (JB1099-25-02492)
Break Down
Mixed Use
Dubai Marina, Dubai, United Arab Emirates
Posted By: SG Community Management Services LLC
Dear Service Provider,Greetings
from Strata Global!
Please
send us you best rate proposal for the Replacement
of chilled water valve in
Marina Arcade located in Dubai Marina.
Please
find Scope of Works outlined below:
Single
position pipe freezing on 400mm Dia chilled water MS/CS line.
Suppl...
AMC for the Chiller, Cooling Tower, and Chemical Supply (JB2332-25-00883)
Contract
Mixed Use
Marinascape Dubai Marina, Dubai, United Arab Emirates
Posted By: Mansions Owners Association Management
Annual Maintenance for the Chiller, Cooling Tower, and Chemical Supply.Please refer to the attachment for a detailed description of services required.For site visiting please contact Lokesha Moolya 058 154 8305; Dheeraj 050 115 9223
Al Manara Tower - Ground Floor Common Washroom Renovation Works (JB007-25-04324)
Enhancement
Commercial
al manara tower business bay, Dubai, United Arab Emirates
Posted By: SAGA International Owners Association Management Services LLC
Dear Service Provider, Greetings from Asteco! Scope of Work: As per the attached damage reportThank you.
RW pipeline modification at B1 & B2 (JB007-25-04265)
Services
Residential
Dorra Bay Tower Dubai Marina, Dubai, United Arab Emirates
Posted By: SAGA International Owners Association Management Services LLC
Dear Service Providers,Greetings from ASTECO!We are seeking for proposals for the below detailed scope of work at Dorra Bay Tower located in Marina, Dubai.1. Do 6” coring on the side shear wall and fix 6” HP PVC pipe. Make waterproof around the pipe passing
through coring 2. Fix 6” cap at the outside of the building...
West Wharf Tower - GYM Room Renovation Works (JB007-25-03852)
Enhancement
Residential
West Wharf Tower Business Bay, Dubai, United Arab Emirates
Posted By: SAGA International Owners Association Management Services LLC
Dear Service Provider, Greetings from Asteco! Scope of Work: Kindly refer the attached Inspection Report. For further queries please contact - Site FM Engineer: Mr. Balu +971 56 164 9806Thank you.
Contract
Mixed Use
Hilliana Tower, Al Sofouh, Dubai, United Arab Emirates
Posted By: HOAM- Highrise Owners Association Management
The Annual Maintenance Contract for Housekeeping and MEP Systems encompasses manpower allocation, working hours, duties and responsibilities, maintenance strategies, and safety protocols. Below is the summary.Manpower RequirementsMEPFacility Supervisor/Team Leader - Day shift (Shared, 0...