Third Party Inspection of Pressure Vessels
Compliance
Posted On:
November 18, 2025
Closing On:
November 22, 2025
JOB REFERENCE:
JB007-25-04750
Third Party Inspection and Certification of Pressure Vessels
| Equipment | Specification | Qty |
| Pressure vessel - Roof Top | Closed
expansion tank Capacity: 500 L Operating pressure: 10 BAR Test Pressure: 15 BAR |
1 |
| Pressure vessel - Mech.Floor | Portable
water interchangeable Membrane Vessel Capacity: 750 L Operating pressure: 10 BAR Test pressure: 15 BAR |
1 |
| Pressure vessel - Roof Top | Expansion
vessel for portable water Capacity: 310 L Maximum working pressure: 10 BAR Operating pressure: 2.6 BAR |
1 |
Terms & Condition
No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
APPLY NOW
SAGA International Owners Association Management Services LLC
Mazaya Business Avenue BB2 Jointly Owned Property
CommercialMazaya Business Avenue BB2 Jumeirah Lakes Tower, Dubai, United Arab Emirates