Supply & Installation of Hot-pressed Insulated GRP Panel Water Tank

Enhancement
Posted On: October 10, 2025
Closing On: October 16, 2025
JOB REFERENCE:
JB007-25-04291

Location: Mazaya Business Avenue BB1 – Mech. Floor

Tank Size: 4.5m (W) x 11m (L) x 3m (H)


Scope of Work Overview:

The scope of this project includes the supply, installation, and commissioning of a new insulated GRP sectional water tank at the mechanical floor, including all required modifications to plumbing connections, dismantling, and disposal of the existing tank.

1. Supply & Installation of New GRP Sectional Insulated Water Tank

1.1 Supply of Materials

  • Supply of GRP Sectional Water Tank (Brand: PIPECO TANKS, MALAYSIA)
  • Insulated hot-pressed GRP panels (non-insulated bottom and manhole)
  • WRAS-approved and backed with a 10-year warranty
  • All tank components and accessories as listed below

1.2 Tank Specifications

  • Internal Support System: Stainless Steel SS 316
  • External Support System: Hot-Dip Galvanized (HDG) Steel
  • Sealant Tape: Non-toxic PVC foam type
  • Roof Vertical Support: Internal PVC pipe
  • Metallic Parts: SS 316/A4 grade (internal), HDG (external)
  • Manhole: Ø750mm with sealed cover and lock
  • Level Indicator: Clear tube type (without markings)
  • Skid Base: HDG steel base with HDG bolts, nuts, and washers
  • Ladders:
    • Internal: GRP ladder
    • External: HDG ladder
  • Fittings (with PVC flange connections):
    • Inlet
    • Outlet
    • Overflow
    • Drain
    • Air Vent

1.3 Installation Works

  • Site preparation at mechanical floor
  • Assembly of GRP tank and support systems
  • Integration with existing water network
  • Modification of existing plumbing connections as required
  • Testing, flushing, and commissioning of the system

2. Dismantling & Disposal of Existing Water Tank

2.1 Dismantling

  • Safe removal of existing water tank (Size: 4.5m x 11m x 3m)
  • Isolation and disconnection from existing plumbing system
  • Removal of associated components and supports

2.2 Disposal

  • Proper disposal of dismantled tank materials and accessories in compliance with local environmental regulations
  • Site clearing and preparation for new installation

3. General Requirements

  • All works must comply with relevant local authority standards and codes
  • Contractor shall provide method statements and safety plans prior to execution
  • Work to be executed by qualified personnel only
  • Site to be cleaned and restored upon completion
  • All required permits and inspections to be coordinated by the contractor

 

Deliverables

  • Complete installed GRP tank as per specifications
  • Commissioning and functionality testing report
  • Warranty certificates
  • As-built drawings
  • Disposal compliance documentation

 

Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
APPLY NOW
SAGA International Owners Association Management Services LLC
SAGA International Owners Association Management Services LLC
Mazaya Business Avenue BB1 Jointly Owned Property
Mazaya Business Avenue BB1 Jointly Owned Property
Commercial

Mazaya Business Avenue BB1 Jumeirah Lakes Tower, Dubai, United Arab Emirates

Share