Supply and replacement of Cooling tower Gear box and Motor
ServicesJOB REFERENCE:
JB007-25-04919
Scope of Work
A. Supply and replacement of Cooling tower
Gear box and Motor
·
Inspect the site prior to commencement of work.
·
Remove the existing fan blades, hub, and gearbox from the
cooling tower.
·
Remove the old gearbox and motor (one by one).
·
Supply a new compatible gearbox and motor.
·
Install the new gearbox and motor.
·
Reinstall the fan blades.
·
Carry out alignment and ensure proper fixing.
3. Cooling Tower
Details (Units 1, 2, 3, and 4)
·
Make:
NIHON SPINDLE
·
Model No.:
CTA-450UKX-3
·
Location:
1st Floor
·
Chiller Make:
Carrier
·
Chiller Model:
30HXC375-AO356-PEE
|
Condition |
Details |
|
Project Timeline |
Completion
within 15 working days after issuance of LPO. |
|
Permissions &
NOCs |
All required
permissions to be obtained by the vendor. |
|
Warranty |
2-year comprehensive
warranty . |
|
Retention |
10% of contract value
to be held for 1 year as defect liability retention. |
|
Coordination |
Contractor to
coordinate with building management to minimize disturbance to residents. |
|
Safety Compliance |
Must comply with UAE
safety and municipality regulations. |
|
Insurance |
Vendor to provide
valid insurance for manpower, material, and liability. |
6. Service Level
Agreement (SLA)
|
Activity |
Performance
Standard |
Response
Time |
Completion
Time |
|
Site Mobilization |
Complete manpower and
material mobilization |
Within 3 working days
of award |
N/A |
|
Execution of Works |
Adherence to scope,
safety & quality standards |
Continuous monitoring |
Within agreed project
duration |
|
Rectification of
Defects (Warranty) |
Attend reported
defects |
Within 48 hours |
Within 3 working days |
|
Site Clean-up &
Handover |
Full cleanup and
debris removal |
Immediate after
completion |
N/A |
7. Key Performance
Indicators (KPI)
|
KPI |
Target |
Measurement
Method |
|
Quality of
Workmanship |
100% compliance with
specifications |
Post-inspection and
approval |
|
Adherence to Timeline |
≥95% on-time
completion |
Progress tracking
report |
|
Safety Compliance |
Zero violations /
accidents |
Site safety audits |
|
Communication &
Reporting |
Weekly updates to
management |
Progress meeting
reports |
|
Warranty Support |
100% rectification
within SLA |
Follow-up &
closure reports |
|
6. Site Contact
Details Building Name: Horizon Tower |