1. Measurement of Earth Resistance
- Perform
earth resistance measurement for each earth pit using a calibrated digital
earth tester.
- Use
the 3-point or 4-point method in accordance with IS/IEC standards (e.g.,
IS 3043).
- Record
readings under stable soil and weather conditions to ensure accuracy.
2. Testing of All Existing Earth Pits
- Conduct
testing on all identified and accessible earth pits within the premises.
- Ensure
compliance with relevant electrical safety and earthing standards.
- Verify
that each pit undergoes proper resistance measurement.
3. Physical Inspection & Verification
- Inspect
the physical condition of each earth pit, including:
- Pit
chamber structure.
- Earthing
electrode exposure.
- Moisture
condition and backfill.
- Check connection
integrity, including:
- Condition
of clamps and termination hardware.
- Tightness
and corrosion status of conductors.
- Continuity
of earth strips/wires.
- Ensure
all components meet required safety and quality norms.
4. Preparation of Earth Test Report
- Prepare
a detailed report containing:
- Pit
number / identification tag
- Location
of each earth pit
- Measured
earth resistance value (ohms)
- Environmental
conditions during testing
- Visual
inspection observations
- Provide
a summary sheet covering all pits tested.
5. Recommendations & Corrective Actions
- Compare
measured values with permissible limits recommended by applicable
standards.
- Provide
recommendations for improvement where resistance values are higher than
allowable limits.
- Suggest
corrective measures such as:
- Soil
enhancement
- Addition
of chemical compound
- Re-tightening
/ replacement of clamps
- Conductor
replacement
- Installation
of parallel earth electrodes (if required)
6. Minor Rectification Work
- Perform
minor corrective actions on-site, including:
- Cleaning
and tightening of clamps and connections.
- Removal
of corrosion from conductor joints.
- Top-up
of water or backfill compounds (if necessary).
- Ensuring
pit covers are properly seated and labeled.
- Report
any major defects that require additional work beyond this scope.
Terms & Condition
No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
APPLY NOW
SAGA International Owners Association Management Services LLC
Mazaya Business Avenue BB2 Jointly Owned Property
CommercialMazaya Business Avenue BB2 Jumeirah Lakes Tower, Dubai, United Arab Emirates