Garbage Chute and Garbage Trolley rectification work.

Services
Posted On: June 19, 2025
Closing On: July 3, 2025
JOB REFERENCE:
JB007-25-02216

Garbage Chute Maintenance:-

1.          Servicing & Repairing Hopper Door Filling Silicon All 4 Sides of the Garbage chute Hopper Door -20 Nos

2.          Supply and replacement of Hopper Door Rubber -07 Nos

3.          Removing the existing Defective Hydraulic Spring and fixing the new Gas Spring. - 07 Nos

4.          Supplying & Installation Electromagnetic-Lock new - 16 Nos.

5.          Supplying & Fixing New Latch’s - 20 Nos.

6.          Supply and replacement Indicators – 5 Nos

7.          Cleaning System - 01 Nos. Full Servicing & Repair with Full Reoperation to operate the cleaning System

8.          Control panel Full Repairing & Re-Operations work including re-wiring from top to bottom with necessary arrangements in the control panel to Re-Operations Locking System including fixing new Spare parts -L/s.

9.          Garbage Chute Duct Inside Cleaning G+44 Floor - Full Garbage Chute Manual Brush & Manual Deep & Sanitizing including Garbage Doors & Chute Duct: -inside cleaning floor by floor (with cleaning liquid mixed by water) by electrically powered cleaning machine and brush. Cleaning Chemicals (contains amongst other ingredient less than 5% anionic, nonionic, soap, perfume, preservation.)

 

Garbage Trolley Maintenance:-

10.       Supply and Installation Trolley Wheel (Heavy Duty) for 3 trolley wheels (Each trolley 4 no’s ) 3x4 =12 no’s

11.       Trolley Bottom Sheet Removing the damaged And Rusted area and Fixing GI Sheet 2MM at the bottom of the trolley to cover the Damaged part with full welding work All 03 Nos. Trolley T1,T2,T3.

12.       Trolley Front Cover 01 Nos. Full Repairing with welding work, hammering work, Side Angle Fixing work with welding work . Trolley Nos. T2

13.       Trolley Front Cover 03 Nos. Supply and installation new with Full welding work. Comes with Side angel Support and Handle Operated . Trolley T1&T3.

14.       Trolley Rubber 3 Nos. Supply and installation new All 03 Nos. Trolley

 

Garbage Trolley Supply: -

15.       Supply of Garbage Galvanized Trolley 2.5cbm – 2 No’s



Community: Horizon Tower, Marsa Street, Dubai Marina

Site Contact: FM Manager Mr. Ramana - 0502725615

Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.

As per standards

Payment will be done after work completion upon submitting the invoice along with work completion/service reports/warranty certificates. 
APPLY NOW
SAGA International Owner Association Management Services LLC
SAGA International Owner Association Management Services LLC
Horizon Tower Jointly Owned Property
Horizon Tower Jointly Owned Property
Residential

Horizon Tower Dubai Marina, Dubai, United Arab Emirates

Share