Facade (Glass and ACP) Rectification
ServicesJOB REFERENCE:
JB2190-25-00080
The scope of
work includes the following activities but not limited to;
Take
necessary approvals from competent authorities, including but not limited to
DMCC and RTA.
1. Façade
Sealant Replacement and Rectification
Issue: Deteriorated weather sealant
across all elevations, leading to potential water leakage.
Scope of
Work:
- Protection of the proposed
working area with barricades on the ground
- Completely remove the aged and
damaged weather sealant.
- Thoroughly clean the area to
eliminate dust, debris, and surface contaminants.
- Pre-treat the cleaned surface
with solvent (R40) to enhance the adhesion of the new sealant.
- Install new backing rods in the
joint gaps for structural reinforcement.
- Apply a fresh coat of
high-performance weather-resistant sealant to:
- Panel-to-panel junctions.
- Panel-to-glass connections.
- Glass-to-glass intersections.
- Horizontal and vertical
seams, including top and bottom sections.
- Utilize advanced rope access,
building cradle techniques, or a combination of both to perform the work
efficiently and effectively.
- Cover all four elevations and
the rooftop area.
Sealant
Specification:
Brand:
Dowsil / Sika 403 or Equivalent. (To be mentioned in the proposal)
Total
Quantity: 50,650
LM (Linear Meters) - (Check the provided report for more details)
2.
Replacement of Damaged ACP Panels
Issue: 180 ACP panels across multiple
elevations are damaged, missing, or loose, posing structural and aesthetic
concerns.
Scope of
Work:
- Establish safety barriers to
secure the working zone.
- Carefully dismantle and remove
compromised ACP panels.
- Assess and reinforce weakened
substructures and frames.
- Enhance the aluminum framework
by adding necessary reinforcements.
- Strengthen internal supporting
structures to ensure stability.
- Manufacture, deliver, and
install 4mm thick fire-rated ACP panels to replace the defective sections.
- Insert adequate backup rods into
horizontal and vertical ACP joints for durability.
- Seal all ACP joints with new
weather-resistant sealant to prevent water infiltration.
- Execute the installation using
specialized rope access and building cradle systems.
Panel
Specifications:
- 4 mm thick fire-rated ACP panel. (To be mentioned in the proposal)
- Brand: Aluco Panel / Alu Bond / Alu Plex or Equivalent.
- Total
Quantity: 180 Nos.
(Check the provided report for more details)
3. Cover Clip/Pressure Plate Replacement
Issue: Missing or damaged cover plates
& pressure plates, which may cause water ingress and structural
instability.
Scope of
Work:
- Identify and replace all damaged
or missing cover clips and pressure plates.
- Source and install cover clips
available in the market (exact color match- mention if the exact color is
not available).
- Use high-quality weatherproof
sealant to enhance durability and protection.
- Remove and substitute any loose
or defective cover clips/pressure plates.
- Install backer rods to fill
gaps, reinforcing structural integrity.
- Apply sealant to close and
secure all exposed gaps effectively.
- Ensure cover clips are firmly
reattached and properly aligned for optimal performance.
- Perform all tasks utilizing rope
access and cradle methods for safe and efficient execution
Work Area: Four elevations as per specified quantity.
Total Quantity: 75 LM (Linear Meters) - (Check the provided report for
more details)
4. Water Testing
Issue: Water
ingress risk due to deteriorated façade components.
Scope of Work:
- Perform a detailed water
infiltration assessment following the completion of repairs to confirm
effectiveness.
- Verify that all joints and
panels are properly sealed to eliminate potential leaks.
- Assess the overall structural
soundness by simulating exposure to water conditions and identifying any
remaining vulnerabilities.
Vendors should submit a fully detailed proposal only after reviewing the provided report below to ensure a complete understanding of
the scope of work and site conditions. If required, vendors may conduct a site
survey at their own expense. Any survey costs will not be included in the
proposal.
Report: https://drive.google.com/file/d/14_C2Q_uBPDc7jGPbh73n64p90-3Iw-8G/view?usp=sharing
STRICTLY FOLLOW THE SCOPE OF WORKS LISTED ABOVE.
Terms & Condition
Payment terms are 30 days after submission of Invoice to accounts@itihad.co.ae (read receipt requested) along with signed work completion or service report and any other documents required by the bank to release funds from RERA regulated escrow account.
The Supplier certifies that to the best of his knowledge and belief no economic, beneficial, or managerial relationship exists between the Supplier and any employee of Itihad Community Management (ICM) or between Supplier and any relative of an employee of ICM or any of its agents, which would tend in any way to influence such employee in performance of his or her duties on behalf of ICM or its agents in connection with the awarding, making, amending, or making a determination concerning performance of its proposal the work or the agreement.
Exchanges or offering of any money, gift item, personal service, entertainment or unusual hospitality by the Supplier to the employees or agents is expressly prohibited. This prohibition is equally applicable to officers, employees, or immediate family members of ICM’s agents. Any violation of this provision constitutes a material breach of ICM’s terms of agreements.
ICM may by written notice to the Supplier disqualify and reject the Supplier’s proposal and terminate the agreement without any liability whatsoever on part of ICM or any of its agents if finding (a) that vendor violated the certification contained in this declaration regarding conflict of interest; or (b) that gratuities were offered or given by the Supplier or any of its employees , agents or representatives, to any officers or employees of ICM or its agents awarding making and/or amending an RFP document or agreement or securing favorable treatment with respect to the performance of such agreement.
Itihad Community Management is not under any obligation to accept the lowest or any proposal.
In the event the Management deems the work unsatisfactory or encounters delays, it reserves the right to impose penalties on the Service Provider or terminate this Work Order with a 3-day prior notice.

ITIHAD COMMUNITY MANAGEMENT

Lakepoint N2
ResidentialLakepoint Tower N2 Jumeirah Lakes Towers, Dubai, United Arab Emirates