Annual Maintenance Contract for ELV System at Lakeside Residence 2027
AMC
Posted On:
November 13, 2026
Closing On:
November 20, 2026
JOB REFERENCE:
JB004-26-05285
Asset Description:
- CCTV System – 252 Cameras
- Access Control –8 nos.
- Intercom System – 3 no.
- SMATV System –3 nos.
- Public Address (PA) System – Installed in common areas
- Gate Barrier - 2 nos.
- ANPR - 2 nos.
Service Frequency
- Preventive Maintenance – Quarterly (4 times/year)
- Breakdown Calls – Unlimited
Consumables & Spare Parts
- Non-Comprehensive AMC
- Maintain a reasonable inventory of essential spare parts.
- PPM consumables included in service.
Emergency Response
- Priority 1 – Emergency: Within 1 Hour (fire/security risk, CCTV/ANPR outage, SIRA blocking issues).
- Priority 2 – Urgent: Within 4 Hours (safety threat, barrier non-functional).
- Priority 3 – Expedited: Within 8 Hours (non-urgent but reputational impact).
- Remote Technical Support: Immediate phone/video guidance to security or FM team when required.
System-Specific Scope
CCTV / ANPR
- Inspect, clean, and test all cameras, lenses, and enclosures.
- Verify DVR/NVR functionality, storage, recording & playback.
- Confirm ANPR synchronization with barriers and database.
- Test remote connectivity and SIRA port forwarding.
Access Control
- Inspect readers, locks, PTE switches, and break-glass units.
- Clean devices, check alignment, update firmware if applicable.
- Verify controller communication and operations.
Gate Barriers / ANPR
- Full diagnostics of automation units.
- Clean motors, cabinets, and check control boards.
- Inspect cabling, sensors, and barrier response time.
Intercom System
- Inspect devices and power supply.
- Test connectivity between all components.
- Verify integration with access control.
SMATV System
- Check dish alignment, cables, and headend equipment.
- Test signal strength and distribution.
- Replace faulty connectors/splitters if needed (chargeable).
PA System
- Inspect amplifiers, speakers, and cabling.
-
Test audibility across all zones.
-
Clean and service microphones and controllers.
General Terms – SIRA Compliance
The contractor shall manage, renew, and coordinate all SIRA-related obligations for Villa Myra’s CCTV, ANPR, and ELV systems, including:
- SIRA ANPR AMC & Connectivity Charges (annual).
- SIRA Video Guard Connectivity Charges (annual).
- Snappy VMS Sites – Technical support, VMS upgrade, and maintenance (annual).
- SSDAC/SPC Consultant & Certification Charges (annual).
- SIRA Inspection Charges (annual).
- SIRA NOC Charges (annual).
- Total SIRA Compliance Charges – consolidated annual obligations.
Vendor Responsibilities:
- Track expiry dates and ensure timely renewals.
- Submit required reports, logs, and compliance documentation to SIRA.
- Coordinate with Snappy VMS and SIRA consultants.
- Ensure DVR/NVR & storage remain certified under SIRA.
- Provide quarterly compliance reports to HOAM/FM.
Documentation & Reporting
The contractor shall provide detailed documentation and reports to HOAM/FM for tracking, compliance, and audit purposes. This shall include:
- Quarterly PPM Reports – Checklist of preventive maintenance activities completed.
- Breakdown/Callout Reports – Record of all breakdown calls with resolution details.
- SIRA Compliance Reports – Quarterly update confirming validity of all licenses, connectivity, and certifications.
- Annual Summary Report – Consolidated report of all PPMs, breakdowns, SIRA renewals, and recommendations.
Safety & Compliance
- Vendor to provide PPE (uniform, gloves, masks, harnesses as required).
- Secure all work areas with partitions and warning signboards.
- Clean site thoroughly post-work; no tools or debris to be left behind.
- Vendor bears full responsibility for workforce safety and insurance.
APPLY NOW
HOAM- Highrise Owners Association Management
Lakeside Residence
Mixed UseLakeside Residence, Jumeirah Lakes Towers, Dubai, United Arab Emirates