Annual Maintenance Contract for Elevator Maintenance( 01 Jan - 31 Dec 2027) KG Tower

AMC
Posted On: November 16, 2026
Closing On: November 23, 2026
JOB REFERENCE:
JB004-26-05301
Category

Lift, Elevator & Escalators

Assets

ELEVATORS - ALL - G

Scope of Work

 

Scope of Work – Elevator Maintenance

Asset Details:

Total Lift – 3 no's

Brand- Mitsubushi

Stops-22

Spare Parts:

Comprehensive

Maintain a reasonable inventory of essential spare parts for maintenance and services falling within the scope of services.

Exclusion – Main traction ropes, OSG ropes, traction sheaves, glass, painting, and ARD Batteries only.

Service Frequency:

Monthly – 12 times/ year

Emergency Callouts- Unlimited

Emergency Response:

Priority 1 – Emergency: Immediately (Within 1/2 hour)

Incident requires urgent interference e.g. Fire incident, Water leakage, Trapped passenger, etc.

Priority 2 – Urgent: Within 1-2 hours

Poses a threat of personal injury, equipment damage, or serious disruption of operations.

Priority 3 – Expedited: 8 Hours

Something that is not classified as urgent but needs to be resolved speedily e.g. a situation that reflects poorly on the Client.

Priority 4 – Scheduled: 24 Hours

Nonurgent to operations. Date scheduled, chargeable works requiring prior client approval

Note: Technical assistance via phone calls shall be provided to the building security or FM the team immediately if required.

Scope of Work:

Inside the Car:

Examine the interior of the elevator car for damage to the walls, ceiling, and handrails.

Examine the position indicator lights and replace any burned out lights.

Operate the elevator going up and down and check the leveling accuracy, acceleration, and deceleration. Make any

adjustments deemed necessary.

Check to make sure that the door moves smoothly and does not slam or bounce.

Make sure the door The restrictor operates properly and makes any necessary repairs.

Outside the Car:

Check the hall stations and lights and replace any burned out lights.

Inspect the door panel and clearances.

Test the Phase 1 firefighters’ service.

Ensure hall equipment ( hall button, interlocks, and indicators ) are working in good condition.

Check the condition of the limit switch, safety gear, rope, and rail and ensure good working status.

Machine Room

Make sure the machine room does not contain any material unrelated to the elevator.

Check components for leaks, unusual vibration, or wear.

Inspect electrical components for evidence of overheating or failure.

Lubricate components, if necessary.

Check the oil level.

Make any necessary adjustments or schedule follow-up service.

 

Traction equipment, control panel, brake, and governor status has to be check and verified.

Top of Car

Check that the stop switches and inspection stations function properly.

Remove any debris from the top of the car.

Inspect any visible components, including rollers, guide rails, and leveling devices.

Check the traveling cables for wear and inspect connections.

Inspect the door operator and its components.

Check the hoistway for evidence of rodents, fire safety, and vandalism.

Pit:

Make sure that the stop switch, lights, and GFI outlet function properly.

Clean the pit and check for signs of leaks.

Inspect the spring buffers for signs of corrosion, alignment, and secure attachment.

Inspect all visible components, including rollers, guide rails, safeties, and switches.

Check the travel cable for wear, pinches, and snags.

Make sure the sump pump is clean and operating correctly.

Safety Policy:

Work Force shall be provided with proper uniform, hand gloves, face mask, and other safety equipment to be used while duty.

Shall take special care to seclude the area of our work by proper partition and provide signboard in the area of work.

Clean the area completely after completion of the work and never leave tools, waste, etc. at the worksite.

The vendor is solely responsible for any liability that may arise due to the injury sustained to its employees during the course of

their work under this agreement.

APPLY NOW
HOAM- Highrise Owners Association Management
HOAM- Highrise Owners Association Management
KG Tower
KG Tower
Mixed Use

Kg tower, Dubai, United Arab Emirates

Share