AL MANARA TOWER | Consultancy Services for Delta T Improvement
EnhancementJOB REFERENCE:
JB007-25-03312
1. Project
Background
Al Manara Tower located in Business Bay,
Dubai, is facing low chilled water Delta T issues. This has led to
inefficient cooling performance and a notice from EMPOWER regarding potential
penalties from 2023, 2024 & 2025.
The tower is equipped with:
- NETIX ODS BMS System
- FAHUs, AHUs, and FCUs serving common and retail/commercial areas
- Chilled water supply by Empower, with submetering via Aquacool
2. Consultancy
Objective
To appoint a qualified MEP or Energy
Efficiency Consultant to:
- Analyze the current Delta T issue
- Diagnose technical and operational inefficiencies
- Develop detailed engineering solutions
- Prepare tender documents for implementation
- Provide support through tendering, evaluation, and supervision
3. Scope of
Consultant’s Services
Stage 1: Site Assessment & Technical
Study
·
- Conduct physical inspection
of ETS room, pumps, heat exchangers, valves, controls
- Review as-built drawings, historical data (DEWA, Empower, BMS)
- Study BMS configuration, logic, and Delta T trend history
- Analyze submetering (Aquacool) and identify gaps
Stage 2: Diagnosis & Feasibility Report
·
- Identify root causes (e.g.,
flow imbalance, coil fouling, faulty valves)
- Assess performance of key HVAC assets
- Submit a technical report with baseline values and ECMs
Stage 3: Design & Tender Documentation
·
- Develop concept design
- Prepare RFP for implementation (BOQ, specs, drawings)
- Define Delta T targets and system requirements
Stage 4: Tendering Support
·
- Assist in issuing RFP to
vendors
- Evaluate submissions and submit comparison report
- Support contractor selection
Stage 5: Post-Award Support
- Review submittals and attend site
meetings
- Provide commissioning and M&V support
4. Expected
Deliverables
·
- Site Assessment Report
- Root Cause Analysis Report
- Design & Justification Report
- Tender Package
- Technical Evaluation Matrix
- M&V Framework
5. Target
Timeline
The consultancy engagement should be
completed within 6–8 weeks, excluding post-award support.
6.
Prequalification Requirements
·
- Experience in Delta T or
chilled water optimization in the UAE
- Familiarity with district cooling systems and EMPOWER
- Experience with Siemens BMS / integrators
- Minimum 2 references for similar projects
7. Submission
Requirements
·
- Company Profile and Trade
License
- Team CVs (Energy Engineers/HVAC specialists)
- Methodology and project approach
- Commercial proposal (separately)
- Sample M&V or Delta T report
Terms & Condition

Asteco (operated under License by SAGA International Owner Association Management Services LLC)
Al Manara Tower Jointly Owned Property
Commercialal manara tower business bay, Dubai, United Arab Emirates