(12 Months) Water Testing & Treatment Contract
Contract
Posted On:
September 11, 2025
Closing On:
September 23, 2025
JOB REFERENCE:
JB6913-25-00249
Water Sampling & Testing Summary
Microbiological Testing
• Podium 1 Staff Canteen – 12 samples
• Basement 1 HK Bottling Room – 12 samples
• Ground Floor Local Bar – 12 samples
• Swimming Pool – 6 samples
•Chemical Testing
• Swimming Pool – 2 samples
Legionella Testing
• Swimming Pool – 4 samples
• Podium 1 Staff Canteen – 4 samples
• 16th Floor HK Bottling Room – 4 samples
• Ground Floor Local Bar – 4 samples
• Swimming Pool Shower Head – 4 samples
• Water Tanks – 32 samples
• Guest Room Cold and Hot Water – 48 samples
• Hot Water Boilers – 4 samples
• Chilled Water System – 4 samples
• Kitchen Cold and Hot Water – 12 samples
• Public Toilets – 8 samples
• Calorifiers – 16 samples
• Ice Machines – 12 samples
Total Bacterial Count (TBC) Testing
• Swimming Pool Shower Head – 4 samples
• Water Tanks – 32 samples
• Guest Room Cold and Hot Water – 48 samples
• Hot Water Boilers – 4 samples
• Chilled Water System – 4 samples
• Kitchen Cold and Hot Water – 12 samples
• Public Toilets – 8 samples
• Calorifiers – 16 samples
• Ice Machines – 12 samples
APPLY NOW

Professional Choice Real Estate LLC
Dolphin Tower
Mixed UseThe First Collection Water Front -Dolphin Tower, Dubai, United Arab Emirates