(12 Months) Water Feature & Lakes Contract
Contract
Posted On:
November 4, 2025
Closing On:
November 14, 2025
JOB REFERENCE:
JB6913-25-00335
AMC for Hot Water System - Quarterly PPM and Monthly Inspection
Scope of Work
• Physical damage in the tank, insulation, and pipe
• Boiler - Leakage and joints
• Exchanger - Leakage and joints
• Circulation pump station leaks and joints
• Support Structures - Paint, bending, welding, joints, screws, and bolts
• Manual and Auto Valves
• Piping Network
• Electrical Wiring
• Heat Transfer Fluids
• Anode
• All circulator
• Expansions vessel
• Ignition and combustion chamber and system
• Boiler pump, gas valve, boiler fan, and controller
• Storage Tanks - Heat Exchanger, gasket, and anode (once in year)
• Flue gas line leakage
• Flue gas analysis (once in year)
• All safety items: PT and pressure relief valves
• Control system and sensors
Cleaning to cover the following:
• Cleaning of strainers if necessary
• Cleaning of boiler inside (once in year)
• Cleaning of calorifier with certification (once in year)
• Flushing of the complete system (once in year)
• Submit quarterly reports detailing inspection results, corrective actions, and recommendations.
APPLY NOW
Professional Choice Real Estate LLC
Dolphin Tower
Mixed UseDolphin Tower Jointly Owned By Professional Choice Real LLC, Dubai, United Arab Emirates