(12 Months) Gate Barrier Contract

Contract
Posted On: October 13, 2025
Closing On: November 10, 2025
JOB REFERENCE:
JB6913-25-00330
AMC for Gate Barrier Systems – Quarterly PPM
Scope of Work
1. General Inspection & Testing
• Inspect and test gate barrier units for proper operation
• Verify smooth and consistent movement of barrier arms
• Check alignment, speed, and responsiveness of barrier operation
• Inspect barrier housing for physical damage, rust, or wear
2. Electrical & Control Systems
• Inspect and test all cables, connectors, and wiring for damage or loose connections
• Check control devices (push buttons, access control panels, RFID readers, etc.)
• Test transmitter and receiver (TX/RX) devices for signal strength and responsiveness
• Inspect transmitter antennas for physical damage and serviceability
• Check magnetic loop detectors and sensors for proper operation
• Test backup batteries for safety devices and emergency operation
• Verify power supply stability and surge protection systems
3. Mechanical Maintenance
• Lubricate all moving parts including barrier arm joints, motor shafts, and gear mechanisms
• Inspect barrier arm for cracks, bends, or structural damage
• Ensure barrier arm markings are visible, reflective, and in good condition
• Clean and remove dust, dirt, and debris from all components and enclosures
• Check for water ingress or corrosion in underground or exposed components
4. Safety & Compliance
• Test emergency stop and manual override functions
• Verify safety sensors and auto-reverse mechanisms
• Ensure compliance with local safety standards and hotel operational protocols
5. Corrective Maintenance
• Rectification of ordinary faults due to fair wear and tear
• Minor repairs and adjustments during routine service visits
• Emergency breakdown support within 24 working hours
• Documentation of faults and repairs performed
6. Major Repairs & Common Issues (parts excluded in the contract but service and installation should be included in AMC scope)
• Replacement of damaged barrier arms or motor assemblies
• Repair of faulty control boards or access systems
• Replacement of worn-out magnetic loop detectors
• Repair or replacement of broken TX/RX units or antennas
• Replacement of backup batteries or power modules
• Rewiring or replacement of damaged cables due to rodents, weather, or vandalism
• Structural repairs to barrier housing or mounting base
• Software reconfiguration or firmware updates (if applicable)
APPLY NOW
Professional Choice Real Estate LLC
Professional Choice Real Estate LLC
SkyBay
Mixed Use

SKY BAY Jointly Owned By Professional Choice Real LLC, Dubai, United Arab Emirates

Share