(12 Months) Cradle (BMU) Contract

Contract
Posted On: September 11, 2025
Closing On: September 23, 2025
JOB REFERENCE:
JB6913-25-00246
AMC for Cradle – Quarterly PPM
Scope of Work
Inspection and servicing of motorized cradle system
Hoist mechanism check and lubrication
Motor performance testing and calibration
Safety lock functionality verification
Control panel inspection and testing
Suspension mechanism (roof rigging, davits, tracks) inspection
Electrical wiring and connections check
Mechanical component integrity assessment
Fall arrestor system inspection and testing
Limit switch functionality check
Emergency stop system verification
Calibration of all safety devices
Compliance check with local safety regulations and standards
Lubrication of all moving parts
Visual inspection of structural integrity
Load testing as per statutory requirements
Cleaning of cradle components and tracks
Tightening of bolts, nuts, and fasteners
Checking for signs of wear, corrosion, or fatigue
Troubleshooting of operational faults
Repair or replacement of worn-out or damaged parts
Adjustment of misaligned components
Emergency breakdown support within 24 hours
Submission of Quarterly PPM service reports
Annual certification of cradle system by qualified personnel
Adherence to manufacturer’s maintenance guidelines
Compliance with Dubai Municipality and Civil Defense regulations
Coordination with hotel engineering team for access and scheduling
APPLY NOW
Professional Choice Real Estate LLC
Professional Choice Real Estate LLC
Dolphin Tower
Mixed Use

The First Collection Water Front -Dolphin Tower, Dubai, United Arab Emirates

Share