(12 Months) Cradle (BMU) Contract
Contract
Posted On:
September 11, 2025
Closing On:
September 23, 2025
JOB REFERENCE:
JB6913-25-00246
AMC for Cradle – Quarterly PPM
Scope of Work
• Inspection and servicing of motorized cradle system
• Hoist mechanism check and lubrication
• Motor performance testing and calibration
• Safety lock functionality verification
• Control panel inspection and testing
• Suspension mechanism (roof rigging, davits, tracks) inspection
• Electrical wiring and connections check
• Mechanical component integrity assessment
• Fall arrestor system inspection and testing
• Limit switch functionality check
• Emergency stop system verification
• Calibration of all safety devices
• Compliance check with local safety regulations and standards
• Lubrication of all moving parts
• Visual inspection of structural integrity
• Load testing as per statutory requirements
• Cleaning of cradle components and tracks
• Tightening of bolts, nuts, and fasteners
• Checking for signs of wear, corrosion, or fatigue
• Troubleshooting of operational faults
• Repair or replacement of worn-out or damaged parts
• Adjustment of misaligned components
• Emergency breakdown support within 24 hours
• Submission of Quarterly PPM service reports
• Annual certification of cradle system by qualified personnel
• Adherence to manufacturer’s maintenance guidelines
• Compliance with Dubai Municipality and Civil Defense regulations
• Coordination with hotel engineering team for access and scheduling
APPLY NOW

Professional Choice Real Estate LLC
Dolphin Tower
Mixed UseThe First Collection Water Front -Dolphin Tower, Dubai, United Arab Emirates