Water Tank Rectification in Al Manara Tower

Product
Posted On: October 28, 2024
Closing On: November 27, 2024
JOB REFERENCE:
JB007-24-03063

Dear service provider,

Greetings from SAGA international

We would like to request for proposal based on the attached scope of work


Tank Details

1. Basement-4 RCC domestic water tank- 1(242 M2)

2. Basement-4 RCC domestic water tank- 2 (242 M2)

3. Rooftop RCC domestic water tank(168 M2)

  • The work will involve draining, cleaning and preparing the internal tank surfaces (all sides including the walls, floors and excluding ceiling).
  • cutting of the existing GRP lining,  wastage cart away and dump in municipality dump yard .
  • Grinding the whole inside surfaces of the tank and clean the tank from foreign particles before applying the GRP lining
  • GRP resins will be applied on the internal tank surface as per the standards for potable water tank lamination.
  • The laminated tank will be well ventilated to facilitate free movement of air and to extract out any volatile or semi volatile organic compounds emitted from freshly applied resin compound.
  • After complete curing, the tank will be inspected to verify the integrity of the applied lining lamination.
  • Following the quality checks, the laminated surfaces will be cleaned and disinfected with food grade disinfectant formulations as a final step before refilling the tank with water for use.

Note: Lining Thickness and Resin Quality

Resins are selected based on the site specific requirements.  below mentioned the quality of resin advisable for the specific work based on the durability to withstand high water temperature during the summer months which causes swift disintegration of inferior quality lining or quality lining if not applied correctly in the required thickness. Require to  applying GRP lamination of 5 mm thickness for the side walls and floor to maintain integrity of the laminated surface in high temperature during the peak summer months.

SAFETY & HYGIENE STANDARDS:

Client required  Safety and Hygiene standards  for such work and gives prime importance to safety and hygiene at work. teams should  trained and certified to carry out confined space jobs and we require  your HSE team to assure complete safety compliance at site.

Warranty requires 10 years

Material : Isophthalic resin


Prior for site inspection, please call our FM Manager on-site, Mr. Fayaz at +971563579749.

Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.

Payment will be done after work completion upon submitting the invoice along with work completion/service reports/warranty certificates. 
APPLY NOW