GYM MAINTENANCE

Contract
Posted On: December 25, 2024
Closing On: December 28, 2024
JOB REFERENCE:
JB6913-24-00050
Item
Annual Maintenance for Gym Equipment Annual Maintenance for gym Equipment Quarterly Non-Comprehensive.
•Inspect control panel and wiring and tighten all connections on the contractor and all other part where cables are terminated. 
•Inspect thermostat settings. 
Inspect the wiring to the heater and underneath the heater. 
•Remove sauna rocks for washing and return to the heater.
 •Always make sure that the heater is full of rocks. The rocks must always cover the elements.
 •Replace Cartridge filters if necessary.
 •Inspects the water level control switch and elements. 
•Inspects Steam separation chamber. 
•Inspects internal stainless-steel compartment. 
•Inspect Pressure relief valve; water control float valve and elements.
 •Inspects all internal workings of the steam generator.
  (01-Jan-2025 to 31-Dec-2025)
QTY
 4
FREQUENCY 
• once in every 3 months (Quarterly) service. 
DURATION 
1st JAN 2025 TO 31st 2025
APPLY NOW
Professional Choice Real Estate LLC
Professional Choice Real Estate LLC
The First Collection Business bay
Mixed Use

The First Collection ,Business Bay, Dubai, United Arab Emirates

Share