Chiller #2 & #3 Rectification Works

Services
Posted On: October 22, 2025
Closing On: November 1, 2025
JOB REFERENCE:
JB007-25-04403
Chiller #2 & #3 Rectification Works

Ch-2 Circuit-A: Stator Rewinding
Unit Model: 30GX-328
Serial No: 12Y616030
Scope of Work:
· Check the general operation and log or report the condition
· Lock-out the chiller.
· Isolate the chiller from electrical source.
· Open the stator of compressor A1 for complete rewinding.
· Take out the rotor for repair.
· Fix back the rotor and stator after repair.
· Supply & replacement of compressor contactor.
· Supply & replacement of SCPM Board
· Supply & replacement of filters.
· Charge refrigerant top-up.
· Charge fresh oil.
· Start-up the chiller and observe the operation.
· Log parameters and hand over the chiller to the customer.

Part & Services Details:

1. REWINDING (COMPRESSOR A1)
Qty.: 1
2. COMPRESSOR CONTACTOR 
Qty.: 3
3. SCPM BOARD
Qty.: 2
4. PANEL COOLING FAN
Qty.: 1
5. COMPRESSOR OIL SW220 20L 
Qty.: 2
6. RIER CORES 
Qty.: 2
7. INTERNAL FILTER 
Qty.: 2
8. EXTERNAL FILTER 
Qty.: 1
9. REFRIGERANT R134-A 13.65KG 
Qty.: 5
10. LABOR CHARGES 
Qty.: LOT

Ch-3: Leak Repair & Replacement of Compressor Contactor
Unit Model: 30GX-328
Serial No: 12Y616029
Scope of Work:
· Check the general operation and log or report the condition
· Lock-out the chiller.
· Isolate the chiller from electrical source.
· Pressure test the circuit-A with nitrogen for leak and repair.
· Evacuate the system as per standards.
· Charge fresh refrigerant and oil on circuit-A.
· Supply & replacement of compressor contactor on circuit-B.
· Supply & replacement of internal & external oil filters on circuit-A.
· Supply & replacement of drier cores on circuit-A.
· Supply & replacement of DGT sensor on circuit-A.
· Supply & replacement of oil solenoid valve on circuit-A.
· Start-up the chiller and observe the operation.
· Log parameters and hand over the chiller to the customer.

Part & Services Details:

1. INTERNAL FILTER 
Qty.: 2
2. EXTERNAL FILTER 
Qty.: 1
3. COMPRESSOR CONTACTOR 
Qty.: 1
4. FAN MOTOR (CKT-B) 
Qty.: 1
5. FAN BREAKERS (CKT-B) 
Qty.: 1
6. FAN CONTACTORS (CKT-B) 
Qty.: 1
7. FAN BOARD 
Qty.: 1
8. PANEL COOLING FAN 
Qty.: 1
9. DGT SENSOR 
Qty.: 1
10. COMPRESSOR OIL SW220 20L 
Qty.: 2
11. DRIER CORES 
Qty.: 2
12. REFRIGERANT R134-A 13.65KG 
Qty.: 14
13. NITROGEN 
Qty.: 3
14. LABOR CHARGES 
Qty.: LOT

Community: Yacht Bay Tower
Location: Marsa Street, Dubai Marina
Site Contact: MEP Supervisor Mr. Sufyan: +971 52 956 2017
Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
APPLY NOW
SAGA International Owners Association Management Services LLC
SAGA International Owners Association Management Services LLC
Yacht Bay Tower Jointly Owned Property
Yacht Bay Tower Jointly Owned Property
Residential

Yatch Bay Tower Dubai Marina, Dubai, United Arab Emirates

Share