Chiller #1 Rectification Works

Services
Posted On: October 21, 2025
Closing On: October 31, 2025
JOB REFERENCE:
JB007-25-04389
Chiller #1 Rectification Works

Ch-1 Circuit-A: Replacement of EXV & Other Parts
Unit Model: 30GX-328
Serial No: 12Y616031
Scope of Work:
· Check the general operation and log or report the condition
· Lock-out the chiller.
· Recover the refrigerant from circuit A.
· Supply & replacement of EXV, EXV cable, EXV board on circuit-A.
· Supply & replacement of internal & external oil filters.
· Supply & replacement of cooler service & saturation valve.
· Supply & replacement of SCPM Boards.
· Supply & replacement of fan board.
· Supply & replacement of DGT sensor.
· Supply & replacement of temperature sensors.
· Supply & replacement of water flow switch & water flow sensor cable.
· Supply & replacement of low & high side transducer.
· Supply & replacement of drier cores.
· Pressure test with nitrogen for leak and repair.
· Evacuate the system as per standards.
· Charge fresh 40L compressor oil.
· Charge recovered refrigerant and top-up.
· Start-up the chiller and observe the operation.
· Log parameters and hand over the chiller to the customer.

Part & Services Details:

1. EXPANSION VALVE (EXV) + EXV CABLE + EXV BOARD 
Qty.: 1
2. INTERNAL FILTER 
Qty.: 2
3. EXTERNAL FILTER 
Qty.: 1
4. COOLER SERVICE VALVE 
Qty.: 1
5. COOLER SATURATION VALVE 
Qty.: 2
6. SCPM BOARDS 
Qty.: 2
7. FAN BOARD 
Qty.: 1
8. DGT SENSOR 
Qty.: 2
9. TEMPERATURE SENSORS 
Qty.: 2
10. WATER FLOW SENSOR CABLE 
Qty.: 1
11. WATER FLOW SWITCH 
Qty.: 1
12. LOW & HIGH SIDE TRANSDUCER 
Qty.: 3
13. DRIER CORES 
Qty.: 2
14. COMPRESSOR OIL SW220 20L 
Qty.: 2
15. REFRIGERANT R134-A 13.65KG 
Qty.: 14
16. NITROGEN 
Qty.: 2
17. LABOR CHARGES 
Qty.: 1 LOT

Community: Yacht Bay Tower
Location: Marsa Street, Dubai Marina
Site Contact: MEP Supervisor Mr. Sufyan: +971 52 956 2017
Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
APPLY NOW
SAGA International Owners Association Management Services LLC
SAGA International Owners Association Management Services LLC
Yacht Bay Tower Jointly Owned Property
Yacht Bay Tower Jointly Owned Property
Residential

Yatch Bay Tower Dubai Marina, Dubai, United Arab Emirates

Share