(12 Months) Water Testing & Treatment Contract

Contract
Posted On: September 11, 2025
Closing On: September 23, 2025
JOB REFERENCE:
JB6913-25-00221

The quantities of chemicals offered are as per the details provided by the Hotel.
The inventory of various chemicals will be maintained as per the general scope of work. And the availability of chemicals supplies without interruption.
Training program for the engineering staff will be conducted regarding the use of chemicals, storage, safety aspects etc.… 
The chemicals are ex-stock at our stores in Dubai. 
Delivery period of chemicals will be within 2-3 working days.
Chemicals mentioned in Annexure-1 will be provided as per systems requirements ,
This contract does not include any dosing system nor its calibration nor maintenance
of any equipment.
Maintenance of Multimedia filter, carbon filter or softener is hotel’s scope of work 
and it will be charged separately, any additional work will be hotel’s scope of work 
and will be charged separately.
The chilled water chemical – corrosion Inhibitor (HCT-500) proposed on 2% water loss
per month. Any deliberate draining of water for maintenance purposes or any leaks from
the system will result in water losses and loss of chemicals, which has to be purchased
separately.
To supply the water treatment
chemicals for chilled, Swimming pool and domestic water and water analysis for a period of one year.
APPLY NOW
Professional Choice Real Estate LLC
Professional Choice Real Estate LLC
The One JVC
Mixed Use

The One JVC, Dubai, United Arab Emirates

Share