Project Overview
This project involves converting the existing Ladies’ Swimming
Pool Area into a functional and aesthetically appealing Sky Garden and Communal
Hall. The objective is to transform the underutilized swimming pool area into a
landscaped and partially enclosed space suitable for relaxation and small
resident gatherings or private events. The project includes structural infill,
civil works, architectural finishes, mechanical and electrical installations,
and associated services to achieve a safe and fully functional facility.
Scope of Work
The contractor shall carry out all necessary works to
convert the swimming pool area into a multi-purpose Sky Garden and Communal
Hall. The works include, but are not limited to:
- Pool
Filling: Filling the existing swimming pool with high-density styrofoam
boxes to form a stable and lightweight base, with an estimated filling
volume of approximately 90 cubic meters (m³).
- Cement
Screed: Applying a 10 cm thick cement screed over an area of approximately
55 m² on top of the filled base to create a level surface suitable for
subsequent finishes.
- Artificial
Grass Installation: Installing durable, non-slippery, and fire-rated
artificial grass over an area of approximately 197 m². The contractor
shall ensure proper substrate preparation, adhesion, and neat edge
detailing. Samples and performance specifications of the artificial grass
must be submitted to management for approval prior to procurement and
installation.
- Air-Conditioning
Systems: Supplying and installing four (4) units of 3-ton capacity
split-type air-conditioning systems, including outdoor and indoor units,
refrigerant piping, insulation, supports, and all necessary accessories
for complete operation.
- Electrical
Works: Providing and installing isolators along with all required
electrical conduiting and cabling for each air-conditioning unit,
integrated with the existing power distribution system.
- Drainage
Works: Supplying and installing the required drain line connections for
A/C condensate discharge and surface water drainage, routed to the nearest
drain point.
- Skylight
Installation: Supplying and installing a framed glass curtain wall
skylight system covering approximately 78 m² of open roof area, complete
with aluminium framing, glazing, sealants, and all necessary accessories
to create a naturally lit, enclosed environment.
3. General Requirements
- The
contractor shall perform a site inspection and detailed survey before
execution to confirm existing dimensions, conditions, and any constraints.
- All
works shall comply with Dubai Municipality (DM), DMCC, and Dubai Civil
Defense (DCD) regulations and relevant UAE construction standards.
- The
contractor shall provide all necessary temporary works, safety measures,
access provisions, and debris removal for safe execution of the project.
- All
materials and equipment shall be new, approved, and conforming to relevant
standards.
- Shop
drawings, method statements, product samples, and data sheets shall be
submitted for approval prior to procurement or installation.
- The
contractor shall coordinate with building management to plan the work
schedule, deliveries, and noise-generating activities to minimize
disturbance to residents.
4. Completion and Handover
Upon completion:
- All
mechanical and electrical systems shall be tested and commissioned to
confirm proper functioning.
- As-built
drawings, warranties, and maintenance manuals shall be submitted to
management.
- The
area shall be cleaned and handed over in a ready-to-use condition, fully
functional, and aesthetically finished to the satisfaction of the client.
5. Project Timeline
The contractor shall submit a detailed work program showing
the sequence of activities and proposed completion timeframe. All works must be
completed within the approved project duration once awarded.
Vendors should submit a fully detailed proposal only after
reviewing the provided report to ensure a complete understanding of the
scope of work and site conditions. If required, vendors may conduct a site
survey at their own expense. Any survey costs will not be included in the
proposal.
Terms & Condition
Payment terms are 30 days after submission of Invoice to accounts@itihad.co.ae (read receipt requested) along with signed work completion or service report and any other documents required by the bank to release funds from RERA regulated escrow account
The Supplier certifies that to the best of his knowledge and belief no economic, beneficial, or managerial relationship exists between the Supplier and any employee of Itihad Community Management (ICM) or between Supplier and any relative of an employee of ICM or any of its agents, which would tend in any way to influence such employee in performance of his or her duties on behalf of ICM or its agents in connection with the awarding, making, amending, or making a determination concerning performance of its proposal the work or the agreement.
Exchanges or offering of any money, gift item, personal service, entertainment or unusual hospitality by the Supplier to the employees or agents is expressly prohibited. This prohibition is equally applicable to officers, employees, or immediate family members of ICM’s agents. Any violation of this provision constitutes a material breach of ICM’s terms of agreements.
ICM may by written notice to the Supplier disqualify and reject the Supplier’s proposal and terminate the agreement without any liability whatsoever on part of ICM or any of its agents if finding (a) that vendor violated the certification contained in this declaration regarding conflict of interest; or (b) that gratuities were offered or given by the Supplier or any of its employees , agents or representatives, to any officers or employees of ICM or its agents awarding making and/or amending an RFP document or agreement or securing favorable treatment with respect to the performance of such agreement.
Itihad Community Management is not under any obligation to accept the lowest or any proposal.
In the event the Management deems the work unsatisfactory or encounters delays, it reserves the right to impose penalties on the Service Provider or terminate this Work Order with a 3-day prior notice.
ITIHAD COMMUNITY MANAGEMENT
Lakepoint N2
ResidentialLakepoint Tower N2 Jumeirah Lakes Towers, Dubai, United Arab Emirates