Chiller 2 & 3 - Rectification Works

Services
Posted On: November 21, 2025
Closing On: November 28, 2025
JOB REFERENCE:
JB007-25-04825
Chiller 2 & 3 - Rectification Works

Scope of work has been attached for reference

Ch-2 Circuit-A: Stator Rewinding

Unit Model: 30GX-328

Serial No: 12Y616030

Scope of Work:

• Check the general operation and log or report the condition

• Lock-out the chiller.

• Isolate the chiller from electrical source.

• Open the stator of compressor A1 for complete rewinding.

• Take out the rotor for repair.

• Fix back the rotor and stator after repair.

• Supply & replacement of compressor contactor.

• Supply & replacement of SCPM Board

• Supply & replacement of filters.

• Charge refrigerant top-up.

• Charge fresh oil.

• Start-up the chiller and observe the operation.

• Log parameters and hand over the chiller to the customer.

 

 

CH-2 Circuit-B:

CH2 Circuit-B: Replacement of Compressors

 

 

Unit Model: 30GX-328

Serial No: 12Y616030

Scope of work:

• Check the general operation and log or report the condition

• Lock-out the chiller & disconnect the compressor from electrical termination.

• Recover the refrigerant from circuit 2.

• Supply & replacement of 1 no’s compressor (2B).

• Supply & replacement of 6 no’s compressor fuses (160A).

• Supply & replacement of SCPM Board.

• Supply & replacement of internal & external oil filters (2 times).

• Supply & replacement of DGT sensors with cables.

• Supply & replacement of compressor oil 40L (2 times).

• Supply & replacement of drier cores (2 times).

• Supply & replacement of O-rings.

• Supply & replacement of compressor contactors.

• Pressure test with nitrogen.

• Evacuate the system as per standards.

• Charge new refrigerant.

• Start-up the chiller and observe the operation.

• Log parameters and hand over the chiller to the customer

Ch-3: Leak Repair & Replacement of Compressor Contactor

Unit Model: 30GX-328

Serial No: 12Y616029

Scope of Work:

• Check the general operation and log or report the condition

• Lock-out the chiller.

• Isolate the chiller from electrical source.

• Pressure test the circuit-A with nitrogen for leak and repair.

• Evacuate the system as per standards.

• Charge fresh refrigerant and oil on circuit-A.

• Supply & replacement of compressor contactor on circuit-B.

• Supply & replacement of internal & external oil filters on circuit-A.

• Supply & replacement of drier cores on circuit-A.

• Supply & replacement of DGT sensor on circuit-A.

• Supply & replacement of oil solenoid valve on circuit-A.

• Start-up the chiller and observe the operation.

• Log parameters and hand over the chiller to the customer.


Community: Yacht Bay Tower
Location: Marsa Street, Dubai Marina
Site Contact: MEP Supervisor Mr. Sufyan: +971 52 956 2017
Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.

As per standards
APPLY NOW
SAGA International Owners Association Management Services LLC
SAGA International Owners Association Management Services LLC
Yacht Bay Tower Jointly Owned Property
Yacht Bay Tower Jointly Owned Property
Residential

Yatch Bay Tower Dubai Marina, Dubai, United Arab Emirates

Share