Water Transfer Pumps (Supply & Installation) - 21st Floor Mechanical Floor

Product
Posted On: April 23, 2025
Closing On: May 5, 2025
JOB REFERENCE:
JB007-25-01203

Water Transfer Pumps (Supply & Installation) - 21st Floor Mechanical Floor


Scope of work :-

  • Removal of existing pumps and motors.
  • Supply, installation, and commissioning of new pumps set as per specifications.
  • Replacement of anti vibrating pads and springs
  • Copper/Metal welding for minor leakage area
  • Supply and Replacement of gate valve and NRV as required
  • Testing and commissioning to ensure proper functionality.
  • Warranty to provided

Building Details: -

  • Total Floors: B3 + B2 + B1 + Ground Floor + 1 to 44 + 46 + Roof & Helipad (47 floors in total).
  • Existing pumps, 3 units Water distribution to 21st Floor to 46th Floor

Existing pump details: -

1.   21st floor – 3 Pumps:

o   Make: KSB

o   Model: Movitec VF-25/10 B

o   Power: 18.5 kW (16.3 kW) -50 Hz


Proposed pump Replacement

·     Recommended Brands: Grundfos or KSB

·     Replacement Pumps for Basement #3 (3 Nos) :

    • Specifications to match

Notes :

  1. Power and capacity of new pumps must be verified for compatibility with existing system design.
  2. All installation work to comply with local standards and codes.
  3. Warranty to be provided


Community details:
Building: Horizon Tower
Location: Marsa Street, Dubai Marina
Site Contact details: Engr. Ramana - 050 272 5615
Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.

Payment will be done after work completion upon submitting the invoice along with work completion/service reports/warranty certificates. 
APPLY NOW
SAGA International
SAGA International
Horizon Tower Jointly Owned Property
Horizon Tower Jointly Owned Property
Residential

Horizon Tower Dubai Marina, Dubai, United Arab Emirates

Share