MEP Spares & Consumables

Product
Posted On: April 21, 2025
Closing On: April 30, 2025
JOB REFERENCE:
JB007-25-01195
MEP Spares & Consumables
Contact person - Richard - 052 876 3594
S.No  Material Description Qty UOM
1 Silicon Sealant- White  1 Box
2 1/2" Angle valve  6 No's
3 Tangit Glue -1L 5 No's
4 PVC Cleaner 5 No's
5 Flexible Hose 1/2" x 1/2" x 300mm 10 No's
6 Garden hose transparent 3/4"  2 Mtr
7 1/2'' Garden Tap 6 No's
8 3/4" Ball Valve _Brass  2 No's
9 63mm PVC End cap push type 8 No's
10 1-1/2" PVC End cap push type 8 No's
11 Underwater silicone white 5 No's
12 HPVC Ball Valve 1/2"  2 No's
13 1-1/4" PEGLER Check Valve Bronze Swing 2 No's
14 1/2" gate valve  10 No's
15 Contactor 25A LC1D09 -Schneider 4 No's
16 Overload relay 6A LRD10 -Schneider 4 No's
17 0.75mm Electric wire -Red -RR 1 Pkt
18 0.75mm Electric wire -black-RR 1 Pkt
19 Electric Wire Connector Terminal, 18MM 1 Pkt
20 AA battery  20 No's
21 AAA battery  20 No's
22 8" Inline Duct Fan  1 No's 
23 Swimming pool Under water lights 12V/ 24W White IP68 8 No's
24 1 Feet 8W CFL tube light 500 No's
25 LED Spotlight 7w 220V Day light - Make -MAX  300 No's
26 Motor Coupling Spider- HRC-180 5 No's
27 Actuator Motor -Acys SRA12-230C2 10 No's
28 Yale 2122 SB Overhead Door Closer, Silver 6 No's
29 Robustline Lever Door Handle Lockset, Complete Set with Handle and Lock body (Silver color ) 30 No's
30 polythene sheet 500 gauge 10 mtr 10 No's
31 Aluminium Flush Tower Bolt (167cm) 30 No's
32 Bison Kit 2 No's
33 Supper glue 10 No's
34 1" Double side Tape (Red / Clear ) 3 No's
35 Aluminium Door Handel  10 No's
36 Aluminium Door lock body  10 No's
Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.

As per standards

Payment will be done after work completion upon submitting the invoice along with work completion/service reports/warranty certificates. 
APPLY NOW
SAGA International
SAGA International
Horizon Tower Jointly Owned Property
Horizon Tower Jointly Owned Property
Residential

Horizon Tower Dubai Marina, Dubai, United Arab Emirates

Share