Brazing of Chiller water pipe leakage in Riser

Product
Posted On: October 15, 2024
Closing On: November 28, 2024
JOB REFERENCE:
JB007-24-02986
1.1
Preparation and cleaning of pipe surface.
1.2
Grind the pipe surface and expose clean metal to check leak area.
1.3
Cut, fit and position MS patch slightly larger than leak area.
1.4
Tack and fully weld the MS patch.
1.5
Grind the weld for smoothness and inspect for defects.
1.6
Carryout hydrostatic leak test by client.
1.7
Finishing and touchup paint works.
Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.