Annual Maintenance Contract for Water Testing and Treatment Services (12 Jun 2027 - 31 Dec 2027) - La Riviera Tower
Contract
Posted On:
August 7, 2026
Closing On:
August 21, 2026
JOB REFERENCE:
JB004-26-03334
AMC for Water Testing & Treatment – La Riviera Tower, Dubai Marina
The objective of this Annual Maintenance Contract (AMC) is to ensure the effective treatment, testing and management of the water systems at La Riviera Tower, Dubai Marina, in compliance with Dubai Municipality, DEWA and international water safety standards.
Asset Description:
- Domestic Water Circuit: 1 No.
- Swimming Pool Circuit: 1 No.
- Chilled Water Closed Circuit: 1 No.
- Water Feature Circuit: 1 No.
Service Frequency & Testing Requirements:
A. Domestic Water Circuit:
- Sampling Points: 4 points (Water Tanks and Random Outlets)
- Frequency: Quarterly
Tests:
- Microbiological (TBC, E.Coli, Coliforms)
- Legionella
- Full Chemical Analysis (pH, chlorine, TDS, hardness, alkalinity, turbidity)