Pergola – Wooden Roof Structure Repair and Replacement of WPC Floor
ServicesJOB REFERENCE:
JB007-25-04569
1. Introduction
Horizon Tower is a
premium residential building located in the heart of Dubai Marina, opposite
DMCC Metro Station. The tower features residential units, amenities, and
landscaped areas designed to offer a modern and comfortable living environment.
As part of the
building’s continuous improvement plan, the management intends to carry
out Pergola Wooden Roof Structure Repair and WPC
Flooring Replacement Works to enhance durability, aesthetics, and
safety across the common areas, including the swimming pool pergola and first-floor
wooden bridges.
2. Scope of Work
A. Pergola – Wooden
Structure
· Inspect, repair, and
replace all damaged wooden components.
· Supply and apply waterproof
and weatherproof wood paint over the entire structure.
· Supply and
install IP67-rated LED lights, including complete wiring and
electrical connections.
B. Pergola – Flooring
· Dismantle and remove
existing wooden flooring and structural supports.
· Supply and
install new base structure suitable for WPC flooring.
· Supply and
install new WPC waterproof and weatherproof flooring.
· Supply and
install IP67-rated recessed floor lights with complete wiring.
C. 1st Floor Wooden
Bridges (2 Nos.)
· Dismantle existing
wooden flooring and side structures.
· Sand, clean, and apply
primer to all CI/GI surfaces where required.
· Apply waterproof
brown wood paint matching pergola finish.
· Supply and
install new WPC flooring with suitable supporting structure.
· Supply and
install new aluminum powder-coated handrails on both bridges.
3. Flooring
Specification
|
Item |
Specification
/ Options |
|
Material |
WPC –
justify selection based on durability, waterproofing, and outdoor
performance. |
|
Appearance |
Wooden texture
– colour to be approved by management prior to installation. |
|
Overall Floor Area |
................ft² |
|
Core Thickness |
5.5 mm |
|
Wear Layer Thickness |
0.3 mm |
|
Individual Plank
Dimensions |
Width: 9” /
Length: 60” |
|
Surface Finish /
Pattern |
Deep embossed |
|
Waterproofing |
100% waterproof
(mandatory). |
|
Installation Method |
Interlocking /
clip-based system (to ensure firm fit and expansion gap control). |
4. Lighting
Specification
· Type: IP67-rated
outdoor LED fixtures.
· Casing: Aluminum or
stainless steel, corrosion resistant.
· Colour Temperature: Warm white (36 V)
or as approved.
· Mounting: Recessed for
floor / surface-mounted for pergola beams.
· Cabling: UV and
water-resistant outdoor wiring, concealed within structure.
· Driver &
Connection: Weatherproof
junction box and appropriate power supply.
5. General Conditions
|
Condition |
Details |
|
Project Timeline |
Completion
within 30 working days after issuance of LPO. |
|
Early Completion
Bonus |
4% of contract value
per week (for
early delivery before deadline). |
|
Delay Penalty |
6% of contract value
per week or
part thereof (for delay beyond agreed completion). |
|
Permissions &
NOCs |
All required
permissions to be obtained by the vendor. |
|
Warranty |
1-year comprehensive
warranty for all materials and workmanship. |
|
Retention |
10% of contract value
to be held for 1 year as defect liability retention. |
|
Coordination |
Contractor to
coordinate with building management to minimize disturbance to residents. |
|
Safety Compliance |
Must comply with UAE
safety and municipality regulations. |
|
Insurance |
Vendor to provide
valid insurance for manpower, material, and liability. |
6. Service Level
Agreement (SLA)
|
Activity |
Performance
Standard |
Response
Time |
Completion
Time |
|
Site Mobilization |
Complete manpower and
material mobilization |
Within 3 working days
of award |
N/A |
|
Execution of Works |
Adherence to scope,
safety & quality standards |
Continuous monitoring |
Within agreed project
duration |
|
Rectification of
Defects (Warranty) |
Attend reported
defects |
Within 48 hours |
Within 3 working days |
|
Site Clean-up &
Handover |
Full cleanup and
debris removal |
Immediate after
completion |
N/A |
7. Key Performance
Indicators (KPI)
|
KPI |
Target |
Measurement
Method |
|
Quality of
Workmanship |
100% compliance with
specifications |
Post-inspection and
approval |
|
Adherence to Timeline |
≥95% on-time
completion |
Progress tracking
report |
|
Safety Compliance |
Zero violations /
accidents |
Site safety audits |
|
Communication &
Reporting |
Weekly updates to
management |
Progress meeting
reports |
|
Warranty Support |
100% rectification
within SLA |
Follow-up &
closure reports |
|
6. Site Contact
Details Building Name: Horizon Tower |
Terms & Condition
SAGA International Owners Association Management Services LLC
Horizon Tower Jointly Owned Property
ResidentialHorizon Tower Dubai Marina, Dubai, United Arab Emirates