One time service, testing & maintenance of LV Switchgear System
Services
Posted On:
October 29, 2025
Closing On:
November 3, 2025
JOB REFERENCE:
JB007-25-04505
One time service, testing & maintenance of LV Switchgear System
- LV PANELS - 1 Nos
- ACB - 2 Nos.
- CAPACIOTR BANKS - 1 Nos.
- ATS - 1 Nos
- SMDB -3No.
ATS Panel Rectification.
- Rectification of Generator ATS system
Supply and Installation of control components for the ATS with Drawing ( SCHNEIDER
MAKE)
Testing and commissioning
Removing of Existing faulty control component.
Supply and Installation of new Control components with wiring.
Connect the control cables to motorized MCCB auxiliary relays, motor and coils.
Preparation of Drawing.
Testing and Commissioning.
Site Details:
Site Name : Park One Building.
Site Location: JVT.
Site Contact Person: Abbos - 0509104509
Terms & Condition
No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
Payment will be done after 30 days work completion upon submitting the invoice along with work completion/service reports/warranty certificates.
As per standards
APPLY NOW
SAGA International Owners Association Management Services LLC
Park One Jointly Owned Property
Mixed UsePark One Jumeirah Village Triangle, Dubai, United Arab Emirates