Chiller#1 Compressor Overhauling & Parts Replacement

Product
Posted On: October 31, 2025
Closing On: November 14, 2025
JOB REFERENCE:
JB007-25-04572
Equipment Detail.
Model: YCIV1000

Serial No: RKSM020008 – System 2


Scope Details: Compressor Overhauling

· Isolate the chiller from electrical source.

· Recover the refrigerant from the ckt2.

· Disengage the compressor.

· Compressor overhauling of ckt2 (if mechanical parts found in working condition)

· Supply and replacement of bearing, O-rings & gasket set of the compressor.

· Perform screw polishing.

· Fix back the compressor after overhauling.

· Pressure test with nitrogen of ckt2.

· Identify and repair the leaks.

· Supply and replace oil filter of CKT-2

· Supply and replace drier cores in CKT-2.

· Charge back the recovered refrigerant and top-up (up to 65 kgs)

· Start-up the chiller and handover to the customer.


Description Qty

MTS45 COMPRESSOR OVERHAULING 1

OIL FILTER WITH ORING 1

DRIER CORES 3

OIL L 5 GAL 1

R134A (13.6 KG) CYLINDER 5

NITROGEN 2

LABOR & CONSUMABLES 1


All work/inspection must be completed in comply with site requirements and to follow the safety procedures All work relevant pre-schedule documents like Work Method statement, Risk Assessment, valid supporting documents, insurance documents etc., to be provided for necessary approval from client appointed FM service provider/safety officer.
All certified PPE’s and safety aspects to be followed strictly.

Below addressing format to be used along with TRN mentioned in proposal
SAGA INTERNATIONAL /ASTECO OWNER ASSOCIATION MANAGEMENT SERVICES LLC FOR: DORRABAY JOINTLY OWNED PROPERTY, DUBAI.
Valid trade license with VAT registration copies to be attached
All staff must be professional and must be aware of work requirements
All work must be done in coordination with client appointed FM representative or onsite FM service provider team Consolidated completion report to be submitted after work completion. All respective warranty documents, completion certificates to be submitted
The proposal must be inclusive of all associated costs. Any exclusion to be mentioned clearly
Make, model rating and specifications to be mentioned in proposal clearly along with applicable warranty.
Applicable warranty to be mentioned in proposal against supply of material and work Manship Payment terms must be 100% after completion and successful invoice submission process.
Contractor must have valid Dubai license for the related work.

For any site assistance, please contact onsite Engineer NAYYER PERVAIZ at 056 9903910.
Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.

As per standards
APPLY NOW
SAGA International Owners Association Management Services LLC
SAGA International Owners Association Management Services LLC
Dorra Bay Tower Jointly Owned Property
Dorra Bay Tower Jointly Owned Property
Residential

Dorra Bay Tower Dubai Marina, Dubai, United Arab Emirates

Share