(2 Years) Automatic Sliding door Annual Maintenance Contract.

Contract
Posted On: June 23, 2022
Closing On: July 23, 2022
JOB REFERENCE:
JB007-22-01429
AMC  for Automatic Sliding Door NON
- COMPREHENSIVE (LABOUR ONLY WITHOUT
SPARE PARTS) # 3No Door.
1 year NON- COMPREHENSIVE (LABOUR ONLY
WITHOUT SPARE PARTS)
The frequency of visit – 4 Periodic Preventive
Maintenance Visits once in every 3 MONTHS.
Any other breakdown calls received during the
contractual period will be attended without any
additional charges.

Detailed Scope of works for Automatic Sliding Doors:
1) Deep cleaning of roller carriage and track
profile and toothed belt
2)The sensitivity of the sensor will be adjusted
3)Lubrication of all moving comparts
4)Alignment of panels
5)Floor guide adjustment
6)All the electronic components will be checked
7)Software updates if necessary will be carried out
7)/reprogramming of operator if necessary will be done.
8)All wiring terminations secured

** Note: All Service providers are requested to send us Signed and Stamped attached Scope of work along with proposal. 
** Duration: Provide a table with each year charges, The charges to be mentioned separately (Year 2023 & 2024)

Terms & Condition

No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless: 

(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and 

(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement. 

The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor. 

Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.

Payment will be done after work completion upon submitting the invoice along with work completion/service reports/warranty certificates. 
APPLY NOW
SAGA International
SAGA International
Park One Jointly Owned Property
Park One Jointly Owned Property
Mixed Use

Park One Jumeirah Village Triangle, Dubai, United Arab Emirates

Share